Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Stonemeade-CS 940127
DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVISION DATE: SENT 11/6/92 11/6/92 11/6/92 11/6/92 1/23/92 1/29/93 2/15/93 2/15/93 3/12/93 4/29/93 7/19/93 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Const. Inspect (S.S. Reloc.) Grading Inspection Const. Insp. (Sidewalk) Const. Insp. (Screen. Wall) TOTALS Stonemeade Dan M. Dowdey 1/27/94 ASSESSED FEE AMOUNT PAID DATE $6,675.00 $6,675.00 11/18~92 $57,850.00 $57,850.00 11/18/92 $20,025.00 $20,025.00 11/18/92 $ 1,340.50 $ 1,340.50 11/18/92 $4,389.00 $4,389.00 11/24/92 $12,377.62 $12,377.62 1/7/93 $3,250.00 $3,250.00 12/3/92 $145.00 $ 145.00 2/18/93 $116.00 $116.00 3/15/93 $116. O0 $ 116. O0 3/2/93 5234.00 $234.00 4/21/93 $208.00 5208.00 6/10/93 5116.00 $116.00 8/6/93 $2,017.33 $2,017.33 9/15/93 $1,064.00 $ 1,064.00 11/4/92 $336.36 5336.36 4/30/93 $1,364.98 $1,364.98 4/30/93 Total Fees Fees Paid Amount Owed 5109,923.45 5109,923.45 $0.00 w/plans) 11/3/92 1/12/93 10/26/92 11/19/92 NOTES This overtime inspection was charged to Rodman Excavation for Copperstone, Huntington Ridge, Parks of Coppell & Stonemeade Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd, Homeowner's Maint. 8/19/93 6/24/93 2/11/93 9/7/93 Prior To Final Acceptance As-Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Escrow (5750.00)