Loading...
DR9306-CS 941122November 22, 1994 M.A. Vinson Construction Co., Inc. M.A. Vinson, President P.O. Box 185577 Fort Worth, TX 76181 RE: Stream G-6/Bethel School Road Drainage Improvements DR 93-06 Dear Mr. Vinson: Enclosed with this letter please find three copies of the contract for the above referenced project. Please sign and return the three copies so that they can be executed by the Mayor. The project was awarded by the City Council to your firm at the November 8th, 1994 City Council meeting. Once the contracts have been signed by the Mayor, a copy will be returned to your office along with a notice to proceed letter. As we previously discussed, there will probably be a change order on this project to incorporate additional gabion work. As part of that change order, I would request that you work with the inspector, Garreth Campbell, to eliminate a large part of the proposed rip-rap at the outfall of the channel in Grapevine Creek to help offset the cost of the proposed change order. If you should have any questions concerning this issue, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. Public Works cc: Jim O'brien, O'brien Engineering