SC-Austin E3-CS 900219COPPELL PUBLIC WORKS
MEMORANDUM
February 19, 1990
TO:
Russell Doyle, City Engineer
FROM: Steve Goram, Director of Public Works
RE:
Traffic Concern - Austin Elementary
Russell, please review to see whether there could
made internally at the above referenced elementary
right-of-way to relieve the traffic congestion and
flow in this area.
be modifications
or in the City's
improve traffic
Chief McKinney was assigned the task to be the project coordinator
since former Chief Griffin was working on this matter earlier.
We need to review all possibilities in trying to utilize both
existing access entries or any other possibility.
I was informed that the reason an ingress/egress was not originally
put i.n.was because of the Fire Depart~t's driveway.
I originally indicated I would need/~ething by ~-~.h. ~ however
since there has. been some changesi to personnel "~vai~d~ie in ~your
division, this ~nformation needs to be provided b~ry 2~
SGG/sm
N 8~,
~>~
2o8~?o'
~:0° 29' 52~
R: 5759,65
L: 50.05' '"
FIRE
STATION
S 89° 01' 00" W
208.70"
DROP OFF