Loading...
SC-Austin E3-LR 860710*-ALPHa, TESTING, INC. 2209 WiscOnsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR COPPELL INDEPENDENT SCHOOL DISTRICT Coppell, Texas July 10, 1986 I~OJECT COPPELL ELEMENTARY SCHOOL Coppell, Texas OUR REPORT NO. 86195-10 WEATHER: PARTLY CLOUDY DATE: 07/10/86 TEMPERATURE RANGE: 95° TO: 95° &LPHA n.~'...~.~: ERIC METZENBACHER THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT AS REQUESTED BY THE CLIENT, FOR FIELD COMPACTION TESTS. THE TECHNICIAN PERFORMED FIELD COMPACTION TESTS OE THE NATURAL SUBGRADE IN THE EASTERN PORTION OF THE BUILDING PAD. ALL TESTS AND RETESTS PERFORMED MET CONTRACT SPECIFICATIONS. TOTAL OF 4 TESTS PERFORMED: 2 RETESTS, ALL TESTS PASSED ALPHA TE$~NG, INC. , ~ · ALPHA.TESTING, INC. 2~09 wisconsin St,, Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEOFOR: COPPELL INDEPENDENT SCHOOL DISTRICT Coppell, Texas DATE: July 10, 1986 PROJECT: COPPELL ELEMENTARY SCHOOL mum NE~)R?~. 86195-10A Coppell, Texas TEST DATA: 1 07/10/86 NSG 2 22.0 100.5 26 98 98 2-AD 2 " NSG 2 22.0 100.5 26 98 98 2-A 3 " NSG 2 22.0 100.5 22 100 100 2-AD 4 " NSG 2 22;0 100.5 25 97 96 2-A TEST LOCATION: i RETEST OF TESTS 1 & 3 ON 07/09/86 2 BLDG PAD SUBGRADE, 30 FT WEST & 50 FT NORTH OF SOUTHWEST CORNER OF EASTERN SECTION A 3 BLDG PAD SUBGRADE, 30 FT WEST & 5 FT NORTH OF SOUTHWEST CORNER OF EASTERN SECTION A 4 RETEST OF TEST #5 ON 07/09/86 1. FILL Z NATURAL SUBGRADE 4. A. TEST RESULTS COMPLY WITH SPECIFICATIONS B, COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Re~l~y Submitted, ,~I~(~N G, INC.