Loading...
DR9306-CS 941108 STREAM G-6/BETHEL SCHOOL ROAD DRAINAGE IMPROVEMENTS DR 93-06 Item Quanity Unit Descripron Engineer's Est. M.A. Vinson Jcske Constrution Co. Linder-Stahl Thomco Construction Rebcon, Inc. Unit Total Price Unit Total Price Unit Price Total Price Unit Total Price Unit Price Total Price Unit Price Total Price Price Price Price 1 64.11 L.F. 10'x6' 525.00 33,657.75 548.90 35,189.98 770.00 49,364.70 740.00 47,441.40 748.71 48,000.012 800.00 51,288.00 Culvert 2 543 $.Y. Pilot 45.00 24,435.00 47.20 25,629.60 44.00 23,892.00 59.00 32,037.00 62.50 33,937.513 80.00 43,440.00 Channel 3 260 C.Y. GabionWall 155.00 40,300.00 153.00 39,780.00 167.00 43,420.00 200.00 52000.00 190.00 49,400.00 190.00 49,400.00 4 1 L.S. Rem. & Rep. 2250.013 2250.00 6500.00 6500.00 10500.00 10,500.00 7695.00 7695.00 12000.00 12,000.00 22000.00 22,000.00 Street 5 1 L.S. Remove 500.00 500.00 2500.00 2500.00 4500.00 4500.00 800.00 800.00 28000.00 28,000.00 15000.00 15,000.00 Wing Wall 6 3 ea. Pipe 500.00 1500.00 385.00 1155.0{ 860.00 2580.00 135.0~ 405.00 250.00 750.00 1000.00 3000.00~ Connections 7 245 C.Y. Rock 12.00 2940.00 75.00 18375.00 61.00 14,945.00 97.0(1 23,765.0~ 79.00 19,355.00 150.00 36,750.00 Rip-Rap 8 37 ea. Tree 65.00 2405.00 250.00 9250.00 190.00 7030.00 225.00 8325.00 480.00 17,760.00 1000.00 37,000.00 Removal 9 1 L.S. Excavate & 1450.00 1450.00 5130.00 5130.00 32000.00 32,000.00 25000.00 25,000.012 26400.00 26,400.00 17000.00 17,000.00 Rec°mpact 10 1 L.S. Excavate& 13500.00 13,500.00 34143.50 34,143.5~3 29000.00 29,000.00 47500.00 47,500.00 110800.0~ 110,800.00 200000.00 200,000.00 Haul Off 11 60 L.F. Guard Rail 35.00 2100.00 47.50 2850.012 64.00 3840.00 42.00 2520.012 75.00 4500.00 75.00 4500.00 12 5600 S.Y. Sodding 3.75 21,000.00 3.75 21,000.00 4.00 22,400.00 3.60 20,160.0( 4.50 25,200.00 5.00 28,000.00 13 820 L.f. Underground ~ 15.00 12,300.0t] 14.25 11,685.001 3.40 2788.0(1 21.00 17,220.0( 14.0t3 11,480.00 25.00 20,500.00 Drag. System