Loading...
SC-Carrollton RE-CS010124 T H E C I T Y O F COPP-EIJ January 24, 2001 Robert Howman Glenn Engineering 100 Decker, Suite 250 Irving, Texas 75062 RE: Carrollton - Farmers Branch ISD Riverchase Elementary Final Acceptance Dear Mr. Howman: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. ctor CC: Jason Lilliar, Dalmac (972-690-6483) Nate Payne, Dalmac (972-690-6483) Mart3' Murphy, JRJ Paving (972-857-2320) C. Callaham, Calhar (972-238-6377) Mark Valencia, Masters & Assoc. (972-620-8298) Mike Martin, Assistant City Engineer Debi Ingram, _~fi~ring Secretary Greg Jones, Chief Building Official Travis Crump, Fire Marshal