SC-Carrollton RE-CS010124 T H E C I T Y O F
COPP-EIJ
January 24, 2001
Robert Howman
Glenn Engineering
100 Decker, Suite 250
Irving, Texas 75062
RE: Carrollton - Farmers Branch ISD Riverchase Elementary
Final Acceptance
Dear Mr. Howman:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
ctor
CC:
Jason Lilliar, Dalmac (972-690-6483)
Nate Payne, Dalmac (972-690-6483)
Mart3' Murphy, JRJ Paving (972-857-2320)
C. Callaham, Calhar (972-238-6377)
Mark Valencia, Masters & Assoc. (972-620-8298)
Mike Martin, Assistant City Engineer
Debi Ingram, _~fi~ring Secretary
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal