Loading...
SC-Carrollton RE-CS000601 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector, Engineering Danny Hightower, Utilities Division Public Works June 1, 2000 Walk-thru Riverchase Elementary School 1. Repair fire hydrant at MacArthur. 2. Repair F.H. valve stack to go on valve (same F.H. as above). 3. Need valve extension for same F.H. above. 4. Mark all (F.H.) in red on curb. 5. F.H. needs post per Larry Davis (See Larry Davis) to guard F.H. from ears. 6. Vault holding water; eannot inspect inside (stop leak and pump down for inspection. 7. Clean meter ean and DC box on irrigation line below fittings. 8. Clean out Dom. curb stops for inspection and eap on pipe at top. 9. Mark in red (WAD) on curb and raise lid and grout inside. 10. Mark in red (MID on manhole on curb. 11. Replace sewer pipe in cleanout. 12. F.H. missing blue marker in street on S.E. side of building. 13. Same F.H. needs valve stack extension. 14. Stub off valve at guardrail - need a 3' extension. 15. Mark all (FHV) in red. 16. Repair F.H. in back of building will not drain & oil top. 17. N.E.F.H. needs extension on valve stack & oil top. 18. N.W.F.H. needs extension on valve stack. 19. Mark (MLV) on curb in blue on MacArthur. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 06~01×00 12:44 ID--CITY OF COPPELL DATE 06/01 S,R-TIME DISTANT STATION ID MODE PAGES 00'2~" CITY OF COPPELL CALLING 01 RESULT OK 0000 214 304 CITY OF CDDPELL ENGtNEER. ING ", CITY OF COPPELL NO. 2BJ) The City With A Beautiful Future P.O 80X e,78 COP~EL~.. TEXAS P.O. Box 478 Cool3el. Texas 75019 972-4~2-0022 May 30, 2000 Robe~ Howman Glenn Engineering 100 Dec_-k_~, Suite 250 lrv[ug, Texas 75062 Carrollton - Farm. s Branch ISD Riv~ Elementary Final Walk-thru Please be advised that a walk-through has been scheduled for Thursday, June 1, 2000 at 9:00 a.m. for the water, sanitary sewer, paving and drainage f~c'ililies in the ~ project. Please ensure that alt facilities are clean and ac~ess~le at that time and that conu'actor's representatives are present to assist with the inspection. Your cooperation in this effort is ~'eatly appr~ciatmi. If you should hnve any questions, please call 972.304-3684 at your earliest convenience. Lany Davis Construction Inspector CC: Jason Lilliar, Dalmac (972-690-6483) Nate Payne, Dalmac (972-690-6483) Mart~ Murphy, flu Pavi~g (972-85'/-2320) C. Callalam, Calhaz (972-[38-~1~ ~ Mark Valencia, Masters & Assoc. (972-620-8298) Mike Martin, Assistant City Engineer Debi lngram, En~ Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal tanny Allison, Co~truclion Inspector MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To-' From: Date: RE: Pavin~ 1. 2. 3. 4. e Larry Davis, Construction Inspector Engineering Larry Morton/Brent Adams Streets Division Public Works June 1, 2000 Walk-thru Riverchase Elementary School Clean & reseal joints in left turn lane painted white. Replace broken corners on all barrier-free ramps painted white. Rout & seal cracks painted white in sidewalk. Replace 35 MPH speed limit sign with concrete base attached to 2" telespar pole with a 1 3A" break-away sign needs to be just like the damaged one at least 7" above the ground from bottom of sign. Change Road Closed sign from orange background to yellow. Drainage 1. Place rock rip-rap at outlets and headwalis. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 86/01/00 15:59 ID--CITY OF COPPELL DATE S~R-TIME DISTANT STATION ID MODE PAGES 00'21" CITY OF COPPELL CALLING 01 RESULT OK 0000