WA9801-SY 990525StanTech Engineering Co
9200 King Arthur Drive
Dallas, Texas 75247-3610
Phone 214/631-4372 Fax 214/631-4380
25 May 1999
StanTech Proposal No. P-0019
Mr. Kenneth M. Griffin, P.E.
City of Coppell
255 Parkway Boulevard
Post Office Box 478
Coppell, Texas 75019 '!.~.09
RE:
Construction Materials Testing and Inspection
Professional Services Proposal for
State Highway 121 Water Line
From: Sandy Lake Road
To: 675 Feet South of Corporate Drive
Coppell, Texas
Dear Mr. Griffin:
StanTech Engineering Company (StanTech) is pleased to provide this proposal
for Construction Materials Testing and Inspection Services for the referenced project.
Following are a scope of services and cost estimate for your review.
SCOPE OF SERVICES
We have based our scope of services and cost estimate on the Project Manual
and construction drawings which you have provided. The scope of services anticipated
includes:
A)
Performance of proctor compaction and nuclear field density tests on
compacted fill soils;
B)
Performance of concrete testing including air content, slump, and cylinder
compression tests on specified concrete placements.
The assumptions made regarding testing frequencies consider the potential that
a decreased frequency of in-place density tests may be performed as experience is
gained with the soil compaction procedures,
Mr. Kenneth M. Griffin, P.E.
25 May 1999
Page Two
COST ESTIMATE
Table I, attached, presents a detailed estimated cost. Our estimate is a
recommended budget amount based upon a moderate construction schedule. We
believe our amount is realistic for this project; however, the actual work performed may
be increased or decreased depending upon the contractors progress. We will honor
the unit prices presented in this proposal and will invoice only for services actually
rendered. We have provided a copy of our General Fee Schedule - Exhibit I for your
review.
SCHEDULING
We are prepared to schedule a soils technician to pick up proctor test samples
upon notification by the City of Coppell construction inspector. Subsequent in-place
density and concrete tests will be scheduled upon request of the construction inspector
to the StanTech dispatcher.
ACCEPTANCE
StanTech is pleased to provide this proposal and looks forward to working with
the City of Coppell on this project. You may authorize this work by executing both
copies of Exhibit II, Agreement for Services, and returning one copy to the
undersigned.
Sincerely,
StanTech Engineering Co.
Manager
Senior Engineer
cc. Mr. Gary Hendricks
Shimek, Jacobs & Finklea, LLP
Consulting Engineers
Table I
Construction Materials Testing for
State Highway 121 Water Line
From: Sandy Lake Road
To: 675 Feet South of Corporate Ddve
Coppell, Texas
StanTech Proposal No. P-0019
25-May-99
Service Description
Task A: Earth Work ( Utility Trench Back~illl
Standard Proctor Compaction Test - (On-site Native Material)
Nuclear Field Density Test
Pavement Subgrade - 1 Test/5,000 S.F./Lift
Trench Backfill - 1 Test/300 L.F.ILift *
Daily Mobilization Charge (per day)
Secretary - Report Preparation (~ .25 hr./mport
Project Manager - Report review ~ .25 hr./report
· (Estimate based upon 4,200 linear feet and 8 - 10 inch loose lifts)
Task B; Concrste
Engineering Technician - Concrate testing and sampling - Portal to Portal
CompressWe Strength Test Cylinders
(4 Cyls/50 C.Y. or Fraction Thereof/Mix/Day of Structural Concrste)
Secretary - Report Preparation ~ 0.25 hr./report
Project Manager- Report review @ 10 min./report
Estimated
Quantity
Units
Unit
Price
Estimated
Cost
3 Each $125.00 $375.00
3 Each $25.00 $75.00
112 Each $25.00 $2,800.00
12 Day $30.00 $360.00
12 Rpt. $10.00 $120.00
12 Rpt. $22.50 $270.00
Subtotal
6 Hours $32.00 $192.00
8 Each $13.00 $104.00
2 Rpt. $10.00 $20.00
2 Rpt. $15.00 $30.00
Task C: Proiect Manaoement
Project Manager - Jobsite Meetings, & Quaility Assurance
Contingency - Approximately 5%
Eatsmated Total Co~t
StanTech Enginesring Co., Dallas, Texas
2 Hours
I Each
Subtotal
$90.00
SubtotBI
$346.00
$180.00
$180.00
$226.30
$4,752.30
Stan Tech
STANDARD FEE SCHEDULE (1998-1999)
Principal Engineer ................................... $125.00
Senior Engineer ...................................... I00.00
Project Manager ...................................... 90.00
Project Engineer/Scientist ............................. 80.00
Staff Enginr~r/SGient,iet ............................... 70.00
Senior Eneineerine Technician ........................... 55.00
Certifie~d Engineering Technician ......................... 36.00
Engineering Technician ................................. ;54.00
CAOP Technician ...................................... 50.00
Secretary ........................................... 40.00
Pootnot~.
Report Cert,*~cat!on, each ............................. $~5.00
Outside Eelices ................................... Cost x 1.15
Travel, Subsistence ................................ Cost, x 1.15
Fdnt~ng, Courier, Foetags ........................... Cost x 1.15
Oefault per diem ...................................... 75.00
Communications Mark-Up Our~of-Town Jobs and/or Clients ..... 2%
Color Copies, per page ................................... 1.50
Copies, per page ........................................ 0.15
Fa~ per page ........................................... 1.00
Photographs, ~x5 or 4xS, each ........................... 1.00
Pickup Truck - Jobsite, per hour .......................... 4.O0
Car or Light, Truck, per mile .............................. 0.45
Surveying Instruments, per day ......................... 25.00
5ample rick-UpCharoJe (DFWAroa) ...................... 25.O0
Minimum THp Charge (DFW Area) ........................ 85.00
Dit Wear for Coring, per inch ............................. 3.00
Core Hole Fatch, per each ............................... 12.50
Coring Equipment, per day .............................. 50.00
Floor Flatness (Plpstlck), per hr. ......................... 10.00
Fortable Generator, per day ............................ 25.00
Nuclear Density Gau(de, per hour ......................... 5.00
LANIDTEC GA-90 Gas Meter, per day .................... 75.00
Drilling without Soil Sampling, 0 - 50 fL, per foot .......... ~6.00
DHIling without, Soil Sampling, below 50 if,., per foot ......... 5.00
O~lling with Soil Samples, 0 - 50 ft., per foot .............. 9.00
[Drilling with Soil Samples, bslow 50 ft., psrfoot ............ 10.S0
NX-Size Carbide 5it Rock Coring, 0 - 50 ft,, per foot, ........ 15.00
NX-~ize Car~ido I~it Reck Codng, below 50 fr,., perfoot ...... 1&O0
NX-Slze Diamond I~it li~ock Coring, 0 - 50 ft., per foot ....... 16,950
NX-Size Diamond 15it Rock Coring, ~elow 50, per foot ........ 19,00
MobiJization, per mile .................................. 2.00
DrilJ Rig and Crew of 2~ per hour ....................... 105.00
t=ootnot~
DHIll,e Fric~ lier~d are f~r ~omFideotl purposes o~ly. eFer~fi~ proJ~-I; Fddrle will be
~uot~l o~ ~quee~
Atterberg Limits .................................... $45.00
Minus 200-Mesh 5ievs ............................... 25.00
Grain Size Analysis .................................. 45.00
Hydrometer Analysis ................................. 80.00
Classffication of Soils, pot sample ...................... 28.00
Unit Weight and Moisture Conl~ot ....................... 12.00
Speclffc Gravity of Clay ............................... 40.00
Moisture Content ..................................... 4.00
Pocket, Penettometer Test ............................. 3.00
Uncoofined Compresslye 5trengt,h (l~) .................. 50.00
O~ with 5~rees/Strain Graph ..........................
Triaxlal Compression ................................ per quote
Direct Shear ...................................... per quote
Permeability (EM 1110-2-1906) ......................... 120,00
Permeability (ASTM D S084) .......................... 175,00
Consofidatfon ..................................... per quol~
Froe-Swell (% swell under apFlied load) .................. 60.00
Pressur~Swell (up to 9 tel) .......................... 100.00
Retoolcling Sample~, pot sample ........................ ~5.00
5ample THmmin~ and Preparation. as required, per sample . ~5.00
Bar Linear Shrinkage Test, per each .................... 20.00
5areFie Preparation for Bar L.5. Test .................... 10.00
Standard Proctor Compaction Test, ..................... 125.00
Modified Proctor Compaction Test, ..................... 140.00
Tex-113-E Compaction Test ........................... 225.00
Tex-llarE Compaction Ratio Test ......................
Relative Density Test ................................ 100.00
Field Density by Nuclear Method, (~ minimum) ............ 25.00
Field Density by Nuclear Method,(with labor charges), each .. 15.00
FH/Lime Series Test ................................. 100.00
At,terberg/Lime Series Test .......................... 180.00
Stan Tech
STANDARD FEE SCHEDULE
Minus 200-Mesh Sieve ............................... $25.00
Grain Size Analysis (Dry M~chod) ....................... 25.00
5-Cycle Sulfat~ Soundness ............................. 175.00
Additional Cyoles, each .............................. 30.00
5c~, FarCities ........................................ 50.00
Fractured Faces ...................................... 25.00
Angular Farticles ..................................... 25.00
Sand Equivalent ...................................... 65.O0
Organic Impudties (Colormetric) ......................... 20.00
Specific Gravity ...................................... 2S.00
Absorption ........................................... 20.00
Dry F, odded Unit Woight ................................ 20.00
Moisture Content ...................................... 5.00
Los Angeles Abrasion ................................. 150.00
Sample Preparation ................................. 60.00
Wet Bali Mill ......................................... 150.00
Sample Preparation ................................. 60.00
Acid Insoluble Kesidue ................................. 45.00
Loss on Ignition ....................................... 50.00
Compressive 5treng'ch Clylinder .......................... $13.00
Flexural Strength l~eam ................................ 20.00
Splitting Tensile Strength .............................. 40.00
Modulus of Elasticity .................................. 40.00
Core Length Determination .............................. 10.00
Core Compressire Strength .............................. 1D.00
End Frep. per inch of did. (if needed) ...................... 2.50
Mix Design (incl. aggregate tes~) ....................... 165.00
Additional Mix Design, with same aggregates ............. 100.00
Water/CBment I~atio Design ........................... 500.00
Kevtew of Mix Design ................................. $125.00
t=ineness by Air Permeability Appara~,us ................... 70.00
Air Content of Hydraulic Cement Mortar .................. 35.00
Time of Setting of Hydraulic Cement ..................... 50.00
Autoclays Expansion of Fortland Csment ................. 125.00
Normal Consistency of Hydraulic Cement ................. 35.00
Specific Gravity of Csment or Fozzolan ................... 35.00
Fineness by No. 32S Sieve .............................. 40.00
Early Stiffenin~ of Portiahal Cement ...................... 35.00
Water I~ntion of Masonry Cement ..................... 65.00
Moisture Content of Fly Ash ............................ 5.00
Lose on Ignition of Fly Ash ............................. 20.00
Fozzolanjc Activity of Portland Cement ................. 150.00
Pozzolanic Activity of Hydral~_~t Lime .................... 90.00
Mortar Bar Drying Shrinkage Incr. ..................... 165.00
Extraction & Gradation ............................. per quote
Laboratory Density & 5~ability (3) .................... per quGr~
Core Density ...................................... per quote
Max Theoretical Specific Gravity ..................... per quote
Hot-Mixed Asphaltic Concrete Mix Design .............. per quote
Additional Mix Design with Same Aggregates ........... per quot~
Batthing, Mixing & Casting of Mortar Cubes, set of thres .
Cube Compressire Streneth ............................ 13.00
Grout C~d. Compresslye 5tren~r,h ........................ 13.00
Masonry Unit Compressire. ~ren~i;h .................... 30.00
Masonry Prism ComF~esive Strength .................. 100.00
lnfrared Inspection, per square font
10,000-40,000 5F ...............................
40,000-80,000 SF ............................... 0,035
Over S0,000 5F .................................. 0.0~0
Minimum Trip Charge .............................. 450.00
12" x 12" Teat Cur, Analysis
1-3 5amplea, each ................................ 275.00
4-10 Samples, each ............................... 2S0.00
OverlOSamplea, each ............................ 22~.00
4" x 4~Y' Test Cut Analysis
1-3 Sampled, each ................................ 22S.00
4-10 5amplea, each ............................... 200.00
Over 10 Earnpies, each ............................. 17~.00
~:~!.l~VOices are due and p~aHe uFon r~dl~ and ~r~ p,,et, 4ue 30
::::;ai~ from invoir, e da~ A ~n/n~;e ~;ha,"ee of 1.5 pmr, m~ Far monf, h,
:!]~ithe maximum allowable by law. will be ~har~Jed on paet; due
:::~aaed or imFl'ee~. ae %0 t~e findines rgcommandationa
~: ~ificatjons, or Frofeeelonal advi6e e~c, epl; t~af, they are
STANTECH ENGINEERING COMPANY
AGREEMENT FOR SERVICES
ProJe~: Condnktkm Materids Teeing
State Highway 121 Water Line
PfoJectLoc~lon(dte):FromS~ndyLe&RoadtolTeFeetSoulhof
comor.~Ddv.
Client: City of Col)pell
CentP~ectNenbec.
aTE Project Ntanber: 16~9-0162
Dato: May 26. 1999
City of Coppell
255 Parkway Boulevard
Post Office Box 478
Coppell, Texas 75019-4409
(the "CLIENT")
lind
StanTech Engineering Company
9200 King Arthur Dr.
Dallas, Texas 75247
("STE~
Madl ~ to:
City of Coppell
255 Parkway Boulevard
Post Office Box 478
Coppell, Texas 75019-4409
EIN: 75-2330818
CL~ENTh~mby~e~3~TE~pr~videtheservk~$se~f~hinPART~Mthepr~je~t"~t~.~ibedheein(~Pmjecr). CUENTegreestope/STEdnarge$
inv~icedby~TEf~rsewice~rendered~nthePm~cti~-"-~`rdan~ev/~PART~andt~beb~undbythe~;i~-'~'"dtem~m~.
pART I,Scope ofWork(Mtoch"Exhlblt l"lfmore qNace l, requlmd) ~Matedals Teeting forthe subject project forthe Scope of Se~ees
prese~tedinStanTechPrr4~aiN~19~Materia~sT"~'"gPr~a~F~r~t~eHigt~.*v/121Wa~rUne~C~pp~Te~as~d~tedMe/
pNTT II.Fee($ttoch"E~iblt fi"lfmore q3$ce ls requlred) The fee v~ll be in accordance with TabM1 "C~t EMimate'of StanTech Proposal No,
0019, d/ed May 25,1999.
Dieckaure of Hazafdous and Toxic Matedal and CondlUmls at the ProJect. (check one)
CL~ENTisn~taware~fanyhazard~usw~es~subMances~t~x~cmatedai~fc~nd~ti~s~f~etr~eumpmductsCH~zard~us~")~
site of the Project, EXCEPT (elect that which is applicable) [] No~e [] Petroleum Fuels Only
[] Those Items Described(attach "Bdliblt fir If more q3ece is required):
Vice President
STANTECH ENGINEERING COMPANY
STANDARD TERMS AND CONDITIONS
a. mw~pe~f~nthesewic~st~bepr~videdbyS~pur~a~ntt~isAgreementi~cc~rd~ncew~thge~efaJ~y~c~e~y~dq~~~
pr~d~nd~i~n~ry~kH~e~datin~tthetjme~fpe~)~mceund~eimibirc~d~the~m~e~~ S'f~wHIrepefomlenyefitlagmed
byw~tlenmgreergl~dgnedby$'~.
r~q~iiief~rjeb~r~i~y~ePr~Je~t~-~Wi~n~t~m~tre~x~t~b~ity~t~he~~m~-~i~~ny~ib~
~01'ST~seewkaepufauBnt~thisAgreement. S~m~yre~y~nd~ument~pf~4dedby~heCL~NTinpeff~n~ningthese~Y~cesrequiredunderthisAgreemen~;~
changedoremendedexceptbymwribnins~,urne~tsignedbyalllx.'6eshere~o.