Loading...
SC-Coppell HS-CS010314T H E (~ I T Y 0 IIr March 14, 2001 Dalmac Construction lll West Spring ValleyRd. P.O. Box 830160 Richardson, TX75083-0160 RE: Coppell High School Final Acceptance Dear Mr. Ivy: A final inspection of Water, Sanitary Sewer and Utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerel~ I~rrY Davis/ ~gnstructiofi Inspector Mike Martin, Assistant City Engineer Rhonda Brothers, Engineering Se.c.retary Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Travis Cramp, Fire Marshal