March 14, 2001
Dalmac Construction
lll West Spring ValleyRd.
P.O. Box 830160
Richardson, TX75083-0160
RE: Coppell High School
Final Acceptance
Dear Mr. Ivy:
A final inspection of Water, Sanitary Sewer and Utilities for the referenced project has been
confirmed by representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincerel~
I~rrY Davis/
~gnstructiofi Inspector
Mike Martin, Assistant City Engineer
Rhonda Brothers, Engineering Se.c.retary
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Travis Cramp, Fire Marshal