Loading...
SC-Coppell HS-CS000809 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector Engineering Gary Price, Utilities Division Public Works August 9, 2000 Walk-Thru Coppell High School - Tri Dal Contractor 2. 3. 4. 6. 7. 8. 10. 11. 12. 13. 14. 15. Turn f'we hydrant around by Tennis Building. Pour pad around fu'e hydrant valve by northwest corner of stadium. Put traffic button out in front of all fwe hydrants. Put handle on f'we line vault for stadium doublechecks. (Check for test for all double \checks. Plug 2na handle on doublecheck by Multi-purpose building. Concrete not poured around MLV by Multi-purpose building. Cut concrete to pour new pad around FHV-MLV behind Multi-purpose building. Grout where tied in extension manhole - fix chimney seal - put rain pan in north end of football field. New concrete end of stadium where extension tied in. Grout where tied in to extension. Raise chimney seal, cleanout manhole. Raise chimney seal, rain pan. Raise chimney seal, put in rain pan. Raise chinmey seal, put in rain pan. Need rain pan. Concrete is not poured around the manhole; possibility of being knocked off. Note: Walk needs to be done at a later date. CITY OF COPPELL PUBLIC IVORK$ DEPARTMENT MESSAGE CONFIRMATION 08/1~'00 11: 26 ID--CITY OF COPPF] I DATE OB/10 S,R-TIME DISTANT STATION ID MODE PAGES 08'38" CITY OF COPPELL CALLING 02 G~cSULT 0000