Loading...
SC-Coppell HS-CS000224EIT)' DF COPPELL EH¢]~[R~e ~ CITY OF COPPELL DEVELOPMENT FEE TABLE NO. 957 [POI Project: Coppell High School Stadium Expansion Date: o~/24/2ooo TOTAL AMOUNT DUE FEES DUE PRIOR.TO COUNCIL APPROVAL Water Impact Fee $0.00 $0.00 (100% due prior to Council Approval), I Water Tap Inspection Fee '$300.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Domestic) $576.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline~ $576.15 (100% due at Issuance of Water Meter) Water Meier Deposit (Domestic) $105.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee ~0.00 $0.00 (100% due prior to Council Approval) Wastewater "]'ap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 ~0.00 (100 % due prior to Council App.roval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee information not Available (100% due prior to Acceptance of Project JJ Street Sign Fee information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAI~' $1,947.30 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL . $0.00 02/25×00 09:]4 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.957 ~02 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell High School Stadium Expansion DATE: 02/24/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): inch = 24 ESU's inch =" 24 lES U's = 0 ESU's = 0 ESU's Total #: 48 ESU's @ $450.00 ea, (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of builcling permit) (All other developments due prior to issuance of meter) Domestic Water Meter Feet Total #: 3 Domestic Meter(s) ~ $192.05 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigaUon/Fireline Water Meter Fee: Total #: 3 Irrigation Meter(s) @ $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0,00 Total #: 0 Fireline Meter(s) ~ $0,00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total ti: 3 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: lotal #: 3 Meter(s) @ $30.00 aa, (100% due prior to issuance of water meters} Wastewater Impact Fee: Total Domestic Melees ESU's: 24 @ $450 O0 ea. Wa~tewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. {,100% due prior to issuance of building permit) $0.00 CISD $300.00 $576,15 $576,15 So.ob $0.00 $105.00 $9000 $0.00 C~SD $150.00 $150.00 Page1 02×25×00 09~4 CITY OF COPPELL ENGINEERING ~ CiTY OF COPPELL NO~9~? ~0~ DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: Single-family ~ $0.00 per lot . Multi-family @ $0.00 per unit (50% paid pnor to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the ligt3ting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $000 Information not Available Street $i1|- Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.957 ! [~04 LT~. 04.2505 PAY TO'tHE ORDP. R DAT~ CHECK NO. TRI DAL LTD. O 02/24/00 227338 ~ COM M£RCE 'ST. ~ SH~ ~1~. ~-~[, ~ ~UTH~K[, TX 7~Z o~c~Ex~ ~ CHE~ ~OU~ ****'1, 947.30 ONE THOUSAND NINE HUNDRED FORTY SEVEN AND 30/100 DOLLARS COPPELL, CITY OF P.O. BOX 478 COPPELL, TX 75019