Loading...
SC-Coppell HS-CS 930113January 13, 1993 Mr. Ken Griffin Department of Engineering City of Coppell P. O. Box 478 ~_ Coppell, Texas~7~9't9 R~ell High Sc Dear Ken: ~ !' 1993 Enclosed is the revised plan for the fire line revision to the Coppell High School Addition. This plan indicates the addition of a new isolation valve located south of the existing fire hydrant. This will allow the new fire line to be tested without adding pressure against any of the City's main line valves. At the jobsite meeting a few weeks ago, the question was asked if a detector check and backflow preventer was to be located on this line. As you can see, this is being installed on the new fire line. Hopefully this plan will answer all questions that were brought up at the jobsite meeting a few weeks ago. Should you have any questions, please do not hesitate to call. Sincerely, SHW Group, Inc. Michael L. Elmore Senior Associate ME/kc Enclosure cc: Mr. Larry Davis, City of Coppell Mr. Howard Pafford, City of Coppell Mr. Troy Glidewell, City of Coppell TO SPRINKLER RISER IN BUILDING I f-~FI. RE LINE.REVISIONS(dAN. 11, 1993) ~ ~ 1 =40~-0 ~N~ULTING ENGINEERS Estes,MeClure 3600 West Way Tyler, Texas 75703 903-581-2677 & Assoc.,Inc. 5601 MacArthur Blvd. Irving,Texas 75038