Loading...
SC-Mockingbird E4-CS 900227DRC DATE: REVIEW OF: BY: oF COPPELL PUBLIC WORKS ENGINEERING DIVISION FINAL PI~AT A/~D PLANS: i) 2) Please make the following additions and/or corrections on final plat as marked: Name of the proposed subdivision must be consistent on the plat and all pages of the construction plans, etc. Location or recorded tract. · width . . and the name of all existing streets intersecting the boundary of the 3) 4) 5) 6) 7) Delineate the existing and proposed zoning of the site and the surrounding properties. The accurate outline of all property which is offered for dedication for public use with the purpose indicated there on. Fire lanes must be shown on final plats. Certification by a registered Public Surveyor to the effect that the plat represents a survey made by him. Delineate utility signature block on the final plat. Per Floodplain Management Ordinance ~87390 (Art. 5, Sec. C, Item 4, Page 34), all subdivision proposals must have the following note placed on the preliminary and final plats: "Floodplain Development Permit Application No. has been filed with the City of Coppell Fl~0dplain Administrator, on , 19.. No (Floodplain Administrator) Comment. Page 1/3 (Date 1) 2) 3') The following information, as marked, is required to be contained in the final construction plans of the above project: Provide final construction plans, simultaneously with final plat submittal. Final plans must have a cover sheet, detailed design plans, and standard detail sheets. A cover sheet, for final construction plans shall include the following: * Name of the project * Owner's name and address * Engineer's name and address * krchitect's name and address * Vicinity map * Index list, covering all pages included in the set ~/ * "Plan Approval Paragraph", see attached - Detailed final constru~ti0n plans shall contain the following: * Ali. required street paving plans and profile sheets. * kll required storm drainage plans and profile sheets. * All required alley paving plans and profile sheets. * A complete and accurate drainage area map and detail grading plan. * Ail required letters of permision from adjacent property owners. * All required water and sewer engineering plans. 4) 5) 7) - Provide barricading plans. Provide trench safety, sealed by a registered engineer in the State of Texas. Delineate proposed and existing water distribution system and pipe sizes. Delineate proposed and existing sewage collection system and pipe sizes Provide a Drainage Area Map covering two parts: a) show On-site Drainage Map, on a scale of 1" = 20', 40' 50' etc. ' with all details as required in the Subdivision Ordinance; b) show the Off-site Drainage Map, on a scale 1" = 100', 200', etc Delineate the project's boundary on it, plus 'the less detailed drainage system, 'to clearly demonstrate 'the affect of such activities, drainage outfalls, on the adjacent properties and 'the Drainage Master Plan. 9) 10) :].2) 1.3 ) - 14) -%/ 15) - all storm sewer systems must be designed for 100-year design frequency. Technical Paper 40 should be used to compute rainfall intensities, as per the Subdivision Ordinance, (Appendix "A", Page 30). Show the hydraulic calculations for each portion of the storm system on the profile, such as pipe size, Q100 (cfs), Qc (cfs), S, v (FPS) etc All lots within or adjacent to the 100-year Floodplain shall have the lowest floor elevation for each building site shown on the site grading plans. A permanent bench mark must be established with in a subdivision development, see attached Floodplain Development checklist. Each sheet of the plans shall contain a title block and consistent page numbers. All appropriate fees as per subdivision ordinance must be paid. Delineate a Revision block on each sheet. Revision dates must be shown on each sheet with Engineer's initials next to them. All above comments must be addressed, prior to Staff's recommendation for approval of the final plat and plans. Provide a written response on all comments with explanations provided on items not addressed as requested above. DRC/COMMENTS/ENG/FINAL SD/bb Page 3/3 PLAN APPROVAL PARAGRAPII For C.&ty En~inee~L RE: RE: RE: PZans P~Lepwted by SI. tee~ of La~s4 Rev.~ion devoe Speaifiea~io~s Prepcwte. d by Shee~ of L¢~t RevisiorL Co~.uc~ion Plan~ and Spec~Lfic~o.~ Effge. CLve do~e Esp~c~on da~e The above ide~.%6~ied p.ga~S and spec. eficc~Oeor~ have been ~teviewed a.,d 6ound to be in comp~an~6 w~k ~h¢ app~ble Engi~e~n~ prou.~io~ of the Code of the C~y of Copp~, Te~c~. Issua~=e of tN~ approv~g sh~ no~ be cor~txued ~ approve& of :the concept {o]t ~he eo~tu¢¢~on d(,%~ of ~ke proposed improveme~¢~ and sh~e.g nox: in any way ~i,~e~6 2h6 ~nwt/Devegopwt and ca. ecL by or ~n~ ~2~om .~he co~cu~on of ~provem6~ ~ provided in the above spe~fied The iSsua~ce of ~.N~ approv~, does not awtho~ize co.~.'Uute:OLon, which co~ue~Lon p/tov.~io~ of the Mu,.Lei~& Cod~ of the C.~y of Copp~2., Te~ and comp.b~ance of ~ o~:h~ s~:~e s/~:~.t:~'t~, and reg~a~ory req~emer~ app~L~ble to the imp/~oveme~C~ spe~ied in tl.~ .Lde~'~fied docume~, in~.uclinfl eompt.~'~on o~ any and ~. ~e.q~eme~f~ of ,?~he C.O~y of Copp~; Te~, ~eq~ng any app~ov~c$. of .(:he Plan~in~j and Zor~.(.n~l Comm.~,sioi~ and C.CCy Court.OiL payment of cc~& fee~, pos~stng o~ c~ bowels c~nc~ .~:hen secwu~.ng an "App/~.ovc~& to ?roceed" from tl'~ C.CCy Eng.Lr~ e~.. Any change~ muSt be approved by ~he app/~olo/uLc~e ~.egu. e. ccto/~y agene. Les as we~g ~ t~'~e C.C~y Eng.Ln~. AfZ:e~. ~l~e Dev~op~ds D~,~,ign En~ine~ app~ove~ the. change, the C~Cy's ~signed Enginew~ng I~pe~or sh~ be coat.Ced who w~ ~k~ approve and/or seccv~e app~ovc~ f~om the C~ty Engineer, ~ w~ck .~e a suppl~& plan approved, w~ b~ affixed .~o ~he app~toved pla~, a~d ref~eneed in a ~u~pleme~tc~ app~tov~ l~wc by tt~e OJ~y Enginew~. ~ ~cev~io~s w~e be in~e. uded i~ ~he 'As-B~" pla~ to be subm~'~ed 30 days aftw~ subSta~ compl~on of ~ pub.~ improv~e~. CITY E~GINEER DATE FLOODPLAIN DEVELOPMENT CHECKLIST The following ltems represent a brief outline of items required by the City of Coppell in order to develop in a floodplain. References are taken from Ordinance 87390. Art. 4C-2 All models must refer to the 2 yr, 100 yr existing, 100 yr ultimate, and tow flow. Art. 4C-2(a) Lowest floor must be higher than BFE + 2' and 100 yr (ULT.) + I'. Art. 4C-2(b) Existing and fully developed 100-year floodplain must be delineated. Art. 4C-2(c) Determine flood storage loss data. Art. 4C-2(e) Flood levels caused by the development plus any anticipated future developments must be less than the 100 yr (ULT) and the 1980 FIS BFE + l'. Art. 4C-2(f) Art. 4C-2(g) Any changes in the floodplain must be submitted to FEMA according to their procedures. Must show evidence of all necessary permits; Local, State and Federal. Art. 5B-1,2 Elevation of lowest floor of shallow flooding areas must be greater than highest adjacent grade + 2' or the structure must be flood protected. Art. 5B-1-2 All work must be certified by a P.E. or R.P.S. Art. 5C-4 The following special note must bc includcd on the plat "Floodplain Development Permit Application No. has been filed with the City of Coppell Floodplain Administrator on , 19 , Floodplain Ad m [nLstrator Date. Art. 5C-5 Boundry's of flooclplain and floodway must be shown on plats. Art. 5C-6 Lowest floor elevations for each lot must be shown on site grading plan. Art. 5C-7 A permanent bench mark must be established within a subdivision development, Art. 5C-8 A following special note must be included on tile plat. "The devel0per,.builder, seller or agent shall inform in writing, each i'prospective buye'r of subdivisi6¢ lots or property loca'i~ed'~'wlthin special flood hazard areas of this site that such property is i~ an identified flood h~zard area and that all development must conform to the provisions of 'the City of Coppell Floodplain Management'Ordinance. :The written notice shall be filed for record in the County deed records and a copy of the notice must' accompany the application for development permit." The above items are only a brief checklist of items need to comply with Ordinance No. 85'390, a detailed review of this Ordinance is necessary [n order to fully understand Its contents. Any submittal [n connection with a floodplain development must include the above Items. This submittal must as a minimum also include the following: Text describing where the basic data was obtained, what ls intended, and the results, all in sufficient: detail so that it is fully understandable and supportable. o Exhibits must be presented that clarify data. These must Include: Water surface profiles, cross sections, work maps, floodplain and floodway delineations for both existing and improved conditions. Comparisons must be shown between existing and proposed conditions for velocities, water surface elevations, storage, and any other impacts. Computer models must be presented in detail, Not Just input and/or summary pr[ntoul:s. July 27, 1989 MEMORANDUM TO: FROM: RE: Russell R. Doyle, P.E., City Engineer Larry Davis, Construction Inspector PERMITTING PROCESS CITY OF COPPELL - ENGINEERING DEPARTMENT 1) Approved Enuineerinu Plans Required - Stamped & Si§ned by the City En§ineer 2) Approved Site Plan for Excavation 3) Pre-Construction Conference With The Enuineerin9 Construction Inspector Required Prior to Start of Construction 4) Excavation Permit Required 5) Utility Construction Permit Required 6) Pavin§ Construction Permit Required 7) Additional Permitting May Be Required Other State, County and Federal 8) Early RouGh Grading Must Be Approved Separately LD/lsu City Departments, PERMTNG