Loading...
Stonemeade-PT 940408Bore/Excavation in Public Right-Of-Way City of Coppe!l - Public Works Department Per:mit Issued To: Addres~ ' Phone: ~mergency Phone: Insp~_ctor: Phone Location of Work: IIave All City and/or Franchise utilities Been Contacted and Existin~ Utilities Located: L/ YES NO will It Be Necessary to Excavate Street, Alley or Sidewalk Pavement? YES (attach permit) ~ NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa_~T_ments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Date Franchise Inspector/or C£Uy Inspecgor Date Applicant shall indemnify and forever hold harmless against each and eve~; claim, demand or cause of ac=ion ghat may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, gunneling, or other work by the applicant under perm. it from the City, if such permi= is granted. P EP~MIT. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the-project. * NO WET BORES ALLOWED!