Loading...
DR9306-CS 940516 May 16, 1994 '~ --O Present: 29 residents along the creek Ken Griffin, City Engineer Mike Martin, Engineer, City Staff Jim O'Brien, O'Brien Engineering GENERAL NOTES AND COMMENTS: - 82 trees within the concrete and gabions or grading areas; may be able to save as many as half of them. - North arrow on sheet 3 is incorrect. · Show flowline elevations at various points on plan view (ends of box, concrete). - Show channel geometry. · Shift gabions and concrete to save trees in the general area between stations 10+35 and 11+20. · Construction notes for drain tie-ins. · May need slope erosion protection near Sra. 16+00 to restrain channel meander. · Check all tributary tie-ins to be sure drainage will occur. · Graded areas will require some type of cover to control erosion; several owners have rescue under trees; one or two have St. Augustine; one suggested Buffalo grass. · Much debris in channel from upstream of Moore Rd., ie: bottles, limbs, grass clippings, other trash. · Ken needs cross sections w/100 year existing and proposed. · Revise plans and return to City by June 15. STREAM G-6 WITH BETHEL SCHOOL ROAD PUBLIC MEETING '~ ~_~ ~% - (::) MONDAY MAY 16, 1994 @ 7:00PM NAME ADDRESS TELEPHONE # 22 23 24 25 STREAM G-6 WITH BETHEL SCHOOL ROAD PUBLIC MEETING MONDAY MAY 16, 1994 @ 7:00PM /,/~.,,~/~ ~.~ "~-'~, /ADDRESS / TELEPHONE# '7 $ 13 14 17 2_1 22_ 23