Loading...
St Andrews Est-CS050304COPPELL March 4, 2005 Terry Holmes The Holmes Builders 2629 Dickerson Carrollton TX 75007 RE: St Andrews Estates Final Acceptance Dear Mr. Holmes: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond (if applicable) will also be two years from the date of this letter. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Since~ "~ Larry ~avis Cons~l~ction Insp6cto~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 CC: Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Civil Engineer f,..~51eun Hollowell, P.E., Assistant Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Jennifer Armstrong, Finance Director