Loading...
WA0302-CS050210FreeseandNichols INNOVATIVE APPROACHE$...PRACTICAL RESULTS LETTER OF TRANSMITTAL To: Kenneth M. Griffin, P.E. Date: City of Coppell Director of Engineering and Public Works 255 Parkway Blvd Coppell, Texas 75019 (972) 304-3686 Febmary 10, 2005 Project: City of Coppell Water, Wastewater, and Roadway Impact Fee Study We are sending you X Attached the following items: [] Under Separate Cover VIA __ · Contract, fee, and schedule with you comments incorporated for the City of Coppell Water, Wastewater, and Roadway Impact Fee Study These items are transmitted for your: X Use [] Review & Comment [] Information X Approval [] Distribution to Parties [] Response [] Records [] Other: __ Remarks: Ken, The following are responses to your letter dated February 4, 2005, by question number: ,,./1) The item has been changed to read, "Proposed location of traffic counts". These are to be under contract with FNI. The City will not need to collect any traffic counts under this project. ,/2) We will collect 24-hour traffic counts to determine the peak and we will use the peak for our calculations. We will provide the 24-hour traffic counts for your records. v/ 3) Electronic formats will be provided in Microsoft Office format, AutoCAD 2005, and/or GIS 9.0.  ,~A separate line item has been shown for a meeting with the Planning and Zoning. The word has been corrected. T:\Coppell\LE~q'ER OF TRANSMI~q-AL of Contract.doc Freese and Nichols, Inc. · Engineers · Environmental Scientists * Architects 4055 International Plaza * Suite 200 * Fort Worth, Texas 76109-4895 (817) 735-7300 · Metro (817) 429-1900 · Fax (817) 735 7491 FreeseandNIchols INNOVATIVE APPROACHES...PRACTICAL RESULTS Electronic forinats will be provided in Microsoft Office format, AutoCAD 2005, and/or GIS 9.0. A separate line item has been for the meeting with Planning and Zoning. u3v'~'The item has been noted and added. ~he item has been removed. The item has been removed. M'~oted and modified. q~r'This item has been removed. Due to the increase in the number of meetings, the fee has gone up slightly. If you are in agreement with the terms listed in the contract, please sign and date the first page and initial the remaining pages of the contract. Please return the signed contract to us for our files. We look forward to working with you on this project. Thanks, Thomas Haster, P.E. By: CC: T:\CoppelI\LETTER OF TRANSMITTAL of Contract.doc Freese and Nichols, Inc. ', Engineers * Environmenta~ Scientists · Architects 4055 International Plaza · Suite 200 · Fort Wodh, Texas 76109-4895 (817) 735-7300 * Metre (817) 429-1900 * Fax (817) 735-7491