WA0302-CS050210FreeseandNichols INNOVATIVE APPROACHE$...PRACTICAL RESULTS
LETTER OF TRANSMITTAL
To:
Kenneth M. Griffin, P.E. Date:
City of Coppell
Director of Engineering and Public Works
255 Parkway Blvd
Coppell, Texas 75019
(972) 304-3686
Febmary 10, 2005
Project: City of Coppell Water, Wastewater,
and Roadway Impact Fee Study
We are sending you X Attached
the following items:
[] Under Separate Cover VIA __
· Contract, fee, and schedule with you comments incorporated for the City of Coppell
Water, Wastewater, and Roadway Impact Fee Study
These items are transmitted for your:
X Use [] Review & Comment [] Information
X Approval [] Distribution to Parties [] Response
[] Records [] Other: __
Remarks:
Ken,
The following are responses to your letter dated February 4, 2005, by question number:
,,./1) The item has been changed to read, "Proposed location of traffic counts". These are to be
under contract with FNI. The City will not need to collect any traffic counts under this
project.
,/2) We will collect 24-hour traffic counts to determine the peak and we will use the peak for
our calculations. We will provide the 24-hour traffic counts for your records.
v/ 3) Electronic formats will be provided in Microsoft Office format, AutoCAD 2005, and/or
GIS 9.0.
,~A separate line item has been shown for a meeting with the Planning and Zoning.
The word has been corrected.
T:\Coppell\LE~q'ER OF TRANSMI~q-AL of Contract.doc
Freese and Nichols, Inc. · Engineers · Environmental Scientists * Architects
4055 International Plaza * Suite 200 * Fort Worth, Texas 76109-4895
(817) 735-7300 · Metro (817) 429-1900 · Fax (817) 735 7491
FreeseandNIchols INNOVATIVE APPROACHES...PRACTICAL RESULTS
Electronic forinats will be provided in Microsoft Office format, AutoCAD 2005, and/or GIS
9.0.
A separate line item has been for the meeting with Planning and Zoning.
u3v'~'The item has been noted and added.
~he item has been removed.
The item has been removed.
M'~oted and modified.
q~r'This item has been removed.
Due to the increase in the number of meetings, the fee has gone up slightly. If you are in
agreement with the terms listed in the contract, please sign and date the first page and initial the
remaining pages of the contract. Please return the signed contract to us for our files. We look
forward to working with you on this project.
Thanks,
Thomas Haster, P.E.
By:
CC:
T:\CoppelI\LETTER OF TRANSMITTAL of Contract.doc
Freese and Nichols, Inc. ', Engineers * Environmenta~ Scientists · Architects
4055 International Plaza · Suite 200 · Fort Wodh, Texas 76109-4895
(817) 735-7300 * Metre (817) 429-1900 * Fax (817) 735-7491