Loading...
DR9306-CS 930811 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 August 11, 1993 ~4~ Otto Scheroder 500 Hawk Court Coppell, Texas 75019 Re: Floodplain Encroachment Dear Mr. $cheroder: This letter is written as a follow-up to our meeting on August 9, 1993. The meeting concerned your ability to fill in the rear of your property to create less steep slopes and to fill in some low areas. I have reviewed our floodplain maps, as contained 'within our City Wide Storm Water Management Study, and it appears that the floodplain ends about 65 feet from your rear property line along your northern property line and about 30 feet from your rear property line along your southern property line (see enel°sed exhibit). This means that you will need to move approximately 65 feet from your rear property line toward Hawk Court before you can start any fill along your northern property line and move approximately 30 feet from your rear property line towards Hawk Lane before you can start any fill along the southern property. By placing those two points on the ground and basically connecting them with a straight line you should get a general idea of where the floodplain encroaches on this property. This floodplain determination was based on elevations in our Storm Water Management Study and our contour maps. For an exact determination of the floodplain on your property, you would need to contact a surveyor to establish the floodplain elevations on your property. If the 65 feet and the 30 feet are acceptable as far as what you ~.e trying to accomplish on your property, then you should complete the Floodplain Development Permit (copy enclosed) and submit it back to the Engineering Department. There is no cost for this permit, it is only a tool to assist the Engineering Department in tracking fill in or adjacent to the floodplain. Please feel free to contact me if you have any additional questions. Sincerely, Kenn~eth M. Griffin, P.E. City Engineer file/kgriffm/500hawk.ltr A DEVELOPMENT PERMIT '4'-2RMIT NO.t~%~ PROPERTY WITHIN FLOODPLAIN STATE OF TEXAS : COUNTY OF DALLAS : CITY OF COPPELL: NAME OF PERMITTEE: 0~0 ~e~~ The above named permittee applied for a D~ELOPMENT PE~IT on . The application has been reviewed by the ~MINIST~TOR ~d it is his determination that the proposed development IS located within an identifiable flood plain of ~ ~ ' ' ~ ' . The ~MINIST~TOR has reviewed plans and specifications of the pro~sed development for conformance with the development standards required by COPPELL flood plain management regulations. You are hereby authorized to proceed with the followin~ described work: ' TO maintain compliance with the development standards of COPPEgg flood plain management regulations and to eliminate or minimize flood potential to the proposed development, yon ~re he~eb~ directe~ construct your proposed development in accordance with the followin~ special proYisions: ( ) For residential structnres, the lowest floor (inclu~in9 ba~ent) must be elevated to t~o (2) feet ~ve the lO0-~ear base floo~ elevation. Minimum finished floor eleYations mnmt be sho~ on the plat for the development a~ approved b~ the Cit~ Engineer. (The lowest floor must be elevated two (2) feet above BFE, or one (1) foot a~ve ultimate condition whichever is hi~her). ) For non-residential structures, the lowest floor (includin~ basement) must be elevated or floodproofed to two (2) feet above the 100-year base flood elevation. Minim~ finished floor elevations must sho~ on the plat or site plan as approved by the City ~ineer. (The lowest floor must be elevated two (2) feet above BFE, or one (1) foot above ultimate condition whichever is hi~her. ) Permittee must submit a certification from a registered professional engineer, architect, or land surveyor that the finished floor level of the residential structure has been constructed two (2) feet a~ve the 100-year base flood elevation, or one (1) foot above ultimate condition whichever is higher. ( ) For non-residential floodproofin~, a registered professional engineer or architect must certify that the floodproofinG methods are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces and other factors associated with the base flood. ( ) For fill activities, the permittee must submit a certification from an engineer or land surveyor that the level of the compacted fill material is at or above the elevation of the Base Flood. ] Provide a certified copy of all final plans or As-Built Drawings to the ~MINIST~TOR. ( ) OTHER PROVISIONS: ~C-~NOWLEDGEMENT OF CONDITIONS BY PERMITTEE DATE / "~' ~-,-~ Jj~C x ~...~rT '"" '-" ' "-: ¢ :[ ......... Jt i"r- [--.-, 17___2Z'"2 ~., ......... - - . '/.:'" ,'/-V:'~/~ "1 . "' '7 .<' - -- / ,_ CHAN'EL WITH 4"Hl~ x IMPROVEMENT - INU~ATION L~E WITH OF BETHEL ,SCHOOL ROAD CONTR~&CLEAR AT 1.27% DALLAS AERIAL ~URVEYS, lNG. ~A~ ~ccu~Ac~ STA~A~ ~ ~T~ F~U~ ~e0 ~N~ ~ENTO~ C~ ~O~ ~mO~ S~U~ ~ 23 4, 27 9~ 40 9.73 4.~4 2 37 7 ~ 3 56 .3 42 6 01 J. 14 ~S. 16 2.64 4.83 7 02 2 50 3 88 1 53 ~8 96 )3. 50 ~6. 39 )o. 45 )3. 04 ,~/' ~3~ .] I I ] [ I I I [ [ ! [ I [ I [ ! I [ I [ I ] I I ! ! [ ! I I ] I I [ I I [ [ [ ! I I ] I I I [ ! ! ! I ~xoo) x~o cfn ~xoo -xzoo. cf~ [ ~uoo)'sso-c~a -' 9(~)-6~0. cfn 9(~]=i50. cfs ' 9(~]=375. cfs 515 _ 505 - 495 - - PROPOSED 100-YEAR WS~L~ 485 ~ ~ O- ~ACKWATER EFFECTS FROM o ~ ~ ~ ~oo YE~ ~s~ _~ 475 ' ~ ~ 2 YEAR WSEL-~ 465 ~~2Z, ~i~~D ~~LOWl iNE : [~ ~ EROSIC N PROTECTION I~' IMPROVED C NNEL ~ _. CLEAR CHANNEL ~ ~ ' ' & GRADE TO DRAIN O _ - ~ i I I I I I I i i I i 1 i ~ i i I I I I I I I I I iiiiIIll~ ,i hi I III I I I ~ I I I I I 445 ~- :~ ? 0 500 1000 1 500 2000 2500 3000 DISTANCE IN ~'i.'