Loading...
WA0302-CS050510FREESE-NICHOL$ 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Phone: (817) 735-7300 Fax: (817) 735-7491 www.freese.com Project Number: CPL05135 TO: Ken Griffin, P.E. FROM: Ellen Musallam, P.E. DATE: May 10, 2005 RE: Coppell Impact Fee Study CC: Thomas Haster, P.E. Chris Bosco, P.E. Project Updates: · Analyzing recent water, sewer, and roadway system improvements for possible inclusion into impact fees · Conducting capacity analysis to determine future infrastructure needs for water and sewer systems. · Conducting existing street inventory to determine impact fee candidate roadways · Conducting capacity analysis to determine future infrastructure needs for the roadway system · Developing updated water, sewer, and roadway Capital Improvements Plan for Impact Fee Calculation Tasks and deliverables for the next two weeks: · Provide proposed Impact Fee Related Capital Improvements Plan for Water, Sewer, and Roadways at meeting on May 24, 2005