WA0302-CS050510FREESE-NICHOL$
4055 International Plaza, Suite 200
Fort Worth, Texas 76109-4895
Phone: (817) 735-7300
Fax: (817) 735-7491
www.freese.com
Project Number: CPL05135
TO: Ken Griffin, P.E.
FROM: Ellen Musallam, P.E.
DATE: May 10, 2005
RE: Coppell Impact Fee Study
CC: Thomas Haster, P.E.
Chris Bosco, P.E.
Project Updates:
· Analyzing recent water, sewer, and roadway system improvements
for possible inclusion into impact fees
· Conducting capacity analysis to determine future infrastructure
needs for water and sewer systems.
· Conducting existing street inventory to determine impact fee
candidate roadways
· Conducting capacity analysis to determine future infrastructure
needs for the roadway system
· Developing updated water, sewer, and roadway Capital
Improvements Plan for Impact Fee Calculation
Tasks and deliverables for the next two weeks:
· Provide proposed Impact Fee Related Capital Improvements Plan for
Water, Sewer, and Roadways at meeting on May 24, 2005