Ken,
If information is available, the following are the roadways that we would like to get construction cost estimate/engineering fees (etc.) for our
analysis for presentation to you next Tuesday, May 24. A PDF with the proposed capital improvement roadways is also attached.
We will need the following construction cost data:
Constr~tion Cost Estimates:
~ Belt Line Road from Denton Tap to MacArthur Blvd.
2.) Belt l~jn~ goad from MacArthur Blvd. to East City Limits
3.) Freeport Parkway from IH 635 to State Road (The portion that the City contributed. We have in the meeting minutes that the State
is contributing $7,000,000, but wanted additional information on what Coppell is contributing if available).
x4-ff~Sand¥ Lake Road from Denton Tap to Macarthur Blvd.
5.) Parkway Blvd from Coppell Road to Moore Road
6.) MacA. rthur_~B_l~vd, from Belt Line Road to North City Limits
Current Engineers estimates would also be helpful for the following Roadways:
Engineers Estimates:
~15) Bethe!.Roa~d from west City Limits to Freeport Pkwy ?
t~).) Sagdy Lake Ro0g from SH 121 to Denton Tap Road ~
x3~ Sandy Lake Road from Macarthur Blvd to east City Limits
Also, if you have contributed to improvements to SH 121, a summary of the City of Coppell's contribution would be helpful.
If you have questions on these requests, please give me a call at the number listed below.
Thank you,
Ellen Musallam, P.E.
Freese and Nichols, lnc.