Loading...
WA0302-CS050527Street Cost for 2005 Impact Fee Update Sandy Lake Denton Tap to MacArthur Construction $ 9,441,368 Design $1,030,683 Geotech $ 30,920 Misc. TXU street lights, ect. $ 193,073 Misc. tree removal, sprinkler repair $ 85,275 Right of way $ 364,018 $11,145,337 Sandy Lake Macarthur to E. city limits Construction $ 4,828,324 Design $ 134,106 Geotech $ 32,231 Misc. ADA review $ 575 Misc. tree removal $ 14,508 Misc. Archaeology survey $ 6,000 Right of way $ 134,116 $ 5,149,860 Sandy Lake Bridge over Elm Fork Right of way $ 43,860 $ 43,860 Beltline Denton Tap to MacArthur Construction $ 438,926 Misc. TXU streetlights $ 70,476 Right of way $ 12,881 $ 522,283 3ethel Freeport to W. city limits Engineer's est. of cost $ 8,277,387 Design $ 545,480 Misc. relocate explorer pipeline $ 48,000 Right of way $ 123,133 $ 8,994,000 Royal Sandy Lake South Engineer's est. of cost $ 753,000 Design $ 18,750 $ 771,750 Sandy Lake SH121 to Coppell Rd. N. Engineer's est. of cost $ 5,014,000 Design $ 451,468 Right of way $ 337,110 $ 5,802,571 Printed 5/27/2005 Created 5~27~2005 Street Cost for 2005 Impact Fee Update ISandy Lake Coppell Rd. N. to Denton Tap Engineer's est. of cost Design Right of way (est.) $4,238,725 $ 677,202 $ 2OO,OOO $ 5,115,927 Parkway Alex to Heartz Construction Design 109,339 19,000 $ 128,339 Royal IH635 to Bethel Drainage cost Misc. RR crossing Right of way $ 224,023 $ 436,579 $ 20,167 $ 680,769 Freeport IH635 to Bethel Construction Design Misc. RR crossing $ 900,364 $ 4,760 $ 112,505 $ 1,017,629 MacArthur Sandy Lake to Beltline Misc. RR crossing $ 182,732 $ 182,732 Freepod Sandy Lake to SH121 Engineer's est. of cost *($2,559,780 from NCTCOG) Design Geotech Right of way (est.) **($1,080,214 from NCTCOG) $ $ 46O,OOO $ 40,250 $ 640,186 $ 1,140,436 =reeport Rubyto Sandy Lake Engineer's est. of cost *($3,3681000 from NCTCOG) Design Geotech Right of way (est.) $ 730,609 $ 632,5OO $ 57,5oo $ 207,000 $ 1,627,609 Printed 5/27/2005 Created 5/27/2005