SC-Coppell MSN-CS 970613 214 304 35?0
CITY OF COPPELL ENGINEERING
,-'?MN
ITY OF COPPELL
NO. 707
DEVELOPMENT FEES
1~'~,O J~CT NAME:
I:NI61NEER:
~,,VISION DATE;
Coppell Middle School North
CISD
6/13/97
SENT
ASSESSMENT
Park Fee
Water Impact Fee
Wastawater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter {Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
ASSESSED FEE
$32,404.25
Total Fees
$32,404.25
AMOd~:I:' PAiD OATE
notify street dept.
$32,404.25
6/12/97
Notify Linde Hayes
& utility department
when meters, taps,
& deposits are paid
Fees Paid Amount Owed
$32,404,25 $0.00
NOTES
Prior To Construction
Erosion Control Approved
E.PA -N.O.I. Racd.
Const. Plan Approved
Irriga[ion Plan Recd.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Aoproved
Erosion Control Maint,
0~×28/97 12:50
CITY OF COPPELL ENGINEERING ~ITY OF COPPELL
DEVELOPMENT FEE WORKSHEET
NO.?O? Q02
PflOJEC~-Copl~lM~$el~ort~
DAI'E: 8/~/~7
Impact Fee:
Domeltic Meter(s):
Irrigation Meter(s):
Fireline Meter(s}:
2 - 3 inCh 32
2 - 8 I~ch 5
ESU'a
ESU's
ESU's
ESU'$
Total
6__..__9.~9 ESU'e ~ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 6 Connections ~ $50.00 es.
(Single family due prior to issuance of building permit)
{All other developme~tl due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 2 Domestic Mater(s) ~i~ ,~ ~ ~1;t44.5Q__
(Single family due prior to iaauance of building permit)
(All other developments due prior to issuance of meter)
War, er Mem. F~ (lrd~tioa/Firelhe):
Total #: 2 Irrigation Meter(a) @
Total #: 0 Additional Imge~on Meter(s}
Total ~: 2 Fireline M~r(s) ~
(100~ due ~rior To issuance of wetw ~ters)
$2,459.17
Waist Met~ i~poMt Fee (Dom):
Total ~: 2 Metefle) ~ $30.00 ea.
(100% duo prior to i~nue of wat~ ~t~)
Irrt~kn~re Meter Deimdt Fee:
Total #: 4 Meter(a) ~1 036.00 ea.
(100% due prior to issuance of water metals)
Wa~ewater ImlmCt Fee:
Total Domestic Metera ESU'
32
~ $450.00 ea.
WaKewater Tap inmj~cfion Fee:
Total #: 2 Connaotiona ~11 050.00
(1~% due prior to issuanoe of building ~mit)
UtflM' Fired Impectkm F*~ (All developments):
Total #: 2 Lot~ ~) $$0.00 es.
(100% due prior to iuuence of building permit)
W=ived
$0,00
04,918.20
$60.00
$100.00
Page 1
03/28/99 12:50 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.?O? ~05
DEVELOPMENT FEE WORKSHEET
Pa]t'l~ Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family ~l $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid odor to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ ~350.00 / Lot
Multi-family ~ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit}
Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Ro: d way Impact Fee:
(See attached fee calculations)
Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans ara submit/ad, $292.60 Der light will be assessed.
(100% due prior te final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$0.00
N/A
Stre(4, Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
N/A
Cot~struction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to Construct the improvements
that are inspected by the Engineering Department.
{2% of development cost required for private improvements)
{4% of deveJopment cost required for public improvements)
Nc~d ~ul~mit~al of
Page 2
03×28×9? 12~50 CITY OF COPPELL ENGINEERING ~ £ITY OF COPPELL NO.?O? ~0~
Proje t:
Date:
DEVELOPMENT FEE TABLE
Coppell Middle School & Elementary North
8/6/97
TOTAL
FEES DUE
Water Impact Fee WAIVED
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $2,289.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $5,737.20
(100%. due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Miter Deposit $140.00
(100% due at Issuance of Wate[ Meter)
Wastewater Impact Fcc WAIVED
(100% due jpr..i,.or to Council Ap. proval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building..P. ermit)
Park Fee $0.00
(100% due p.r..i.,or to Council A~?proval)
Roadway Impact Fee $0.00
(100% due pr.!or to Council Ap. proval)
Street Light Fee Information not
(100% due prior to Ac..~eptance of Proj_e.c.t available at this tun~
Street Sign Fee Information not
(100% due prior to Ac.~eptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $8,726.20