Loading...
SC-Coppell MSN-CS 970613 214 304 35?0 CITY OF COPPELL ENGINEERING ,-'?MN ITY OF COPPELL NO. 707 DEVELOPMENT FEES 1~'~,O J~CT NAME: I:NI61NEER: ~,,VISION DATE; Coppell Middle School North CISD 6/13/97 SENT ASSESSMENT Park Fee Water Impact Fee Wastawater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter {Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ASSESSED FEE $32,404.25 Total Fees $32,404.25 AMOd~:I:' PAiD OATE notify street dept. $32,404.25 6/12/97 Notify Linde Hayes & utility department when meters, taps, & deposits are paid Fees Paid Amount Owed $32,404,25 $0.00 NOTES Prior To Construction Erosion Control Approved E.PA -N.O.I. Racd. Const. Plan Approved Irriga[ion Plan Recd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Aoproved Erosion Control Maint, 0~×28/97 12:50 CITY OF COPPELL ENGINEERING ~ITY OF COPPELL DEVELOPMENT FEE WORKSHEET NO.?O? Q02 PflOJEC~-Copl~lM~$el~ort~ DAI'E: 8/~/~7 Impact Fee: Domeltic Meter(s): Irrigation Meter(s): Fireline Meter(s}: 2 - 3 inCh 32 2 - 8 I~ch 5 ESU'a ESU's ESU's ESU'$ Total 6__..__9.~9 ESU'e ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections ~ $50.00 es. (Single family due prior to issuance of building permit) {All other developme~tl due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 2 Domestic Mater(s) ~i~ ,~ ~ ~1;t44.5Q__ (Single family due prior to iaauance of building permit) (All other developments due prior to issuance of meter) War, er Mem. F~ (lrd~tioa/Firelhe): Total #: 2 Irrigation Meter(a) @ Total #: 0 Additional Imge~on Meter(s} Total ~: 2 Fireline M~r(s) ~ (100~ due ~rior To issuance of wetw ~ters) $2,459.17 Waist Met~ i~poMt Fee (Dom): Total ~: 2 Metefle) ~ $30.00 ea. (100% duo prior to i~nue of wat~ ~t~) Irrt~kn~re Meter Deimdt Fee: Total #: 4 Meter(a) ~1 036.00 ea. (100% due prior to issuance of water metals) Wa~ewater ImlmCt Fee: Total Domestic Metera ESU' 32 ~ $450.00 ea. WaKewater Tap inmj~cfion Fee: Total #: 2 Connaotiona ~11 050.00 (1~% due prior to issuanoe of building ~mit) UtflM' Fired Impectkm F*~ (All developments): Total #: 2 Lot~ ~) $$0.00 es. (100% due prior to iuuence of building permit) W=ived $0,00 04,918.20 $60.00 $100.00 Page 1 03/28/99 12:50 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.?O? ~05 DEVELOPMENT FEE WORKSHEET Pa]t'l~ Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family ~l $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid odor to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ ~350.00 / Lot Multi-family ~ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit} Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Ro: d way Impact Fee: (See attached fee calculations) Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans ara submit/ad, $292.60 Der light will be assessed. (100% due prior te final acceptance of development) N/A N/A N/A N/A N/A N/A $0.00 N/A Stre(4, Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Cot~struction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to Construct the improvements that are inspected by the Engineering Department. {2% of development cost required for private improvements) {4% of deveJopment cost required for public improvements) Nc~d ~ul~mit~al of Page 2 03×28×9? 12~50 CITY OF COPPELL ENGINEERING ~ £ITY OF COPPELL NO.?O? ~0~ Proje t: Date: DEVELOPMENT FEE TABLE Coppell Middle School & Elementary North 8/6/97 TOTAL FEES DUE Water Impact Fee WAIVED (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,289.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,737.20 (100%. due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Miter Deposit $140.00 (100% due at Issuance of Wate[ Meter) Wastewater Impact Fcc WAIVED (100% due jpr..i,.or to Council Ap. proval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building..P. ermit) Park Fee $0.00 (100% due p.r..i.,or to Council A~?proval) Roadway Impact Fee $0.00 (100% due pr.!or to Council Ap. proval) Street Light Fee Information not (100% due prior to Ac..~eptance of Proj_e.c.t available at this tun~ Street Sign Fee Information not (100% due prior to Ac.~eptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $8,726.20