Loading...
SC-Coppell MSW-CS010905 T H E · C: I T Y · O F COPPE £ September 5, 2001 Robert Howman Glenn Engineering Corp. 100 Decker Court Suite 250 Irving, Tx 75062 RE: CMSW 2001 Additions/Renovations Fee Assessment Letter Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please note that Impact Fees are not assessed against the CISD. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer CC: Jennifer ArmsU'ong, Finance Director Rhonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Coppell Middle School gFest 2001 Addition/Renovation Date: 9/5/2001 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrlgation~Fireline) $378.74 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 ( 100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $538.74 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE WORKSHEET _PROJECT: Coppell Middle School West 2001 Addition/Renovation ATE: 9/5/2001 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 2 - 2 inch = 16 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 0 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) (no impact fees acessed to CISD per Ordinance) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $189.37 - Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation]Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $0.00 $100.00 $0.00 $378.74 $0.00 $0.00 $0.00 $60.00 $0.00 $0.00 $0.00 · rk Fee (For Residential Developments Only): Page 1 DEVELOPMENTFEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $0.00 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: - A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for pdvate improvements) (4% of development cost required for public improvements) Information not Available Page 2