Loading...
SC-Coppell MSW-CS 960726The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 26, 1996 Buddy Echols Coppell Independent School District 200 S. Denton Tap Road Coppell, TX 75019 JUL ~9 1998 RE: Coppell Middle School West Development Fee Assessment Dear Mr. Echols: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for Coppell Middle School West. Please make payment to the City of Coppell in the amount of $8,325.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our depam~lent so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely,~.t,~x Gri~ffin,~p..' Kenneth M. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEE SUMMARY SHEET Project: Coppeil Middle School West Date: July 26, 1996 TOTAL A_MOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact * 1,125.00 1,125.00 Water Tap Inspection * 50.00 paid Water Meter (Domestic) * -0- -0- Water Meter (Irrigation & Fire) * 2,580.90 paid Water Meter Deposit (Non-residential) * -0- -0- Irrigation Meter Deposit * 35.00 paid Wastewater Impact * -0- -0- Wastewater Tap Inspection * -0- -0- Utility Final Inspection * 50.00 paid Park * N/A N/A Roadway Impact 7,200.00 7,200.00 Street Light N/A N/A (Fee @ $292.60 per light. Cannot be assessed until TU Electric submits the lighting plan) Street Sign * N/A N/A Construction Inspection 2,080.00 paid (2% of project cost due for private improvements) (4% of project cost due for public improvemems) TOTAL $13,120.90 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 8,325.00 * See Development Fee Work Sheet or Resolution No. 010996.3 of the Cede of Ordinances to determine payment due dates for individual fees. DEVELOPMENT FEE WORK ~EET RE: 0.o,o~l .fv~dgl~ <~,xool ~Oe~'{' Date: Water hnpact: Domestic Meters #__ __ (inch) = O ESU's Irrigation Meters #__ __(inch) = O ESU's Fireline Meters # X ~ (inch) = 2,~ ESU's Total # ~,, ~ ESU's @ $450.00 ea (100% due prior to Council approval of the final plaO Water Tap Inspection: ~d Io~ e,o~.~c~rt Total # I Connections @ $50.00 ea -~-Zg'qb (Single family due prior to issuance of buiMing permit) (All other developments due prior to issuance of meter) Water Meter (l omestic): Total #__ - (inch) Domestic Meters @ ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter (lrrigation/Fireline): Total #__ __.(inch) Irrigation Meters @ 0 ca Total # I ~ (inch) Fireline Meters @ 9.~$ ~0 ea TotalS (100% due prior to issuance of water meters) Water Meter Deposit (Multi-family or Non-residential): Total # t~ Meters @ $30.00 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit: Total # I Meters @ $35.00 ea ~ ~-~ ¢o~-,~¢~o% (100% due prior to issuance of water meters) ~ '~'~ ~ Wastewater Impact: Total Domestic Meters ESU's - 0 @ $450.00 ea (100% due prior to Council approval of the final plat) Wastewater Tap Inspection: Total # ~ Connections @ $50.00 ea (100% due prior to issuance of building permiO Utility Final Inspection (all development): Total # I Lots @ $50.00 ea ~c~ ~,~ (100% due prior to issuance of building permiO '~' -? - 7 b' q t, = O -- O = O = O = Page 1 of 2 Park: DEIfRI~OPMENT FEE WOI~ SII~,ET (cont) l~6~d~l~ C~cb,0ol LOeb'/'Date: · Peliminary plat approval prior to June 23, 1992: Residential lots @ $150.00 ea Units (multi-family) @ $75.00 ea (50% paid prior to Council approval of final plat) (50% paid at issuance of buiMing permit) · Preliminary plat approval after June 23, 1992: # Residential lots @ $350.00 ea # Units (multi-family) @ $350.00 ea (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) · Preliminary plat approval after October 26, 1993: # Residential lots @ $1,285.00 ea # Units (multi-family) @ $1,285.00 ca (100% paid prior to Council approval of final plat) Roadway Impact: Separate fee calculations attached. Street Lighting: Fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of project) Street Signs: Separate Street Sign Assessment form will be provided. (100% due prior to final acceptance of project) Construction Inspection: Copy of contract must be submitted for assessment (2% of project cost due for private improvements) (4 % of project cost due for public improvements) = Page 2 of 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Middle School West ?/2.6/96 I~OADWAY IMPACT FEE: I0 Service Area * Category ** Institutional Land Use ** Coppell Middle School West Maximum Number of Students' 300 Development Units (# of students) ** 300 Vehicle Miles per Development Unit ** 0.08 Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)