Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development. Please note
that Impact Fees are not assessed against the CISD.
Please provide a copy of the Engineer's estimate or contract to our office so the 2% &
4% construction inspection fee can be verified.
The additional fees for water and sewer taps, water meters, and utility inspection fees
need to be paid at the Public Works Service Center, 732 Deforest. Meters will be ordered
when these fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
CCi
Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
~H~, ~emt Director of PubliC Works
Oreg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
.DEVELOPMENT FEE TABLE
Project: CMSWService Center
Date: 9/$/20Ol
TOTAL AlVIOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $250.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,085.70
(100% due at Issuance of Water Meter)
Water Meter Fee (IrfigationfFireline) $2,725.49
(100% duc at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
IcrigationfFireline Meter Deposit $120.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Wastewatcr Tap Inspection Fee $50.00
(100% due at Issuance of Buildinl~ Permi0
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee aformation not Available
(100% due prior to Acceptance of Project 11
Construction Inspection Fee Information not Available
II
TOTAL $4,316.19
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
DEVELOPMENT FEE WORKSHEET
._.PROJECT: CMSW Service Center
)ATE: 9/5/2001
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 3 inch = 16 ESU's
3 - 2 inch = 24 ESU's
0 = 0 ESU's
1 - 8 inch = 2.5 ESU's
Total #: 0 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
(no impact fees assessed per ordinance)
Water Tap Inspection Fee:
Total #: 5 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: I Domestic Meter(s) @ $1,085.70
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 3 Irrigation Meter(s) @ $189.37
~ Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $2,157.38
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $450.00 ea.
(no impact fees assessed per ordinance)
Wastewater Tap Inspection Fee:
Total 0: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ali developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$0.00
$250.00
$1,085.70
$568.11
$0.00
$2,157.38
$35.00
$120.00
$0.00
$50.00
$50.00
~rk Fee (For Residential Developments Only):
Page 1
DEVELUPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electdc submits
the lighting plan for the proposed development.
Once the plans ara submitted, $292.60 per light will be assessed.
(100% due pdor to final acceptance of development)
$0.00
$0~00
$0.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
~ The contracts should indicate the cost to construct the improvements
that ara inspected by the Engineering Department.
(2% of development cost raquirad for private improvements)
(4% of development cost raquired for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: CMSW Service Center
DATE: 9/5/2001
ROADWAY IMPACT FEE:
~ervice Area * 10
~atei~or~ ** Institutional
Land Use ** Institutional Others Not Specified
Building Area (sf) 46,334
Development Units ** 46.33
Vehicle Miles per Development Unit ** 0.56
Fee ]?er Vehicle Mile *** $300
Roadway Impact Fee due -- (Development Units) x
Vehicle Miles per Development Unit) x IFee per Vehicle MileI = $7,784.11
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
[ AMOUNTDUE: $0.00 [
Impact Fees not assessed against the CISD
DEVELOPMENT FEES
PROJECT NAME: CMS Service Center
ENGINEER: Glenn Eng.
OR G NAT ON DATE: 9/5/01
SENT ASSESSED FEE AMOUNT PAID DATE
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Insp 2%
Construction Insp 4%
Roadway Impact-Zone
Street Cut Permit
Overtime inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
noti~ street dept.
$2,830.47 $2,830.47 10/9/01
$2,336.75 $2,336.75 10/9/01
$250.00 $250.00
$50.00 $50.00
$1,085.70 $1,085.70
$2,725.49 $2,725.49
$35.00 $35.00
$120.00 $120.00
$50.00 $50.00
TotaIFees Fees Paid
$9,483.41 $9,483.41
9/14/01
Amount Owed
$o.oo
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.