Loading...
SC-Town Center E8-CS 940901COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: September 1, 1994 Larry Davis, Construction Inspect~,~ I [,,~"1 Rey Gonzales, Street Superintended,/ Walk Through - Town Center Elementary Street personnel performed a walk through at the above referenced project. items that are deficient: 3. 4. 5. 6. 7. 8. Below is a list of N Driveway - Random seal crack from saw cut at north end. South end of drive - Take saw joint out to existing saw cut. Middle Driveway - Concrete curb needs to be patched (also puddles). South Driveway - Chipped and cracked concrete at driveway approach to street. All driveways need sealed or resealed. South Driveway - Carry out saw cut into curb, second saw cut from the south. Random seal crack at S. driveway in the center line area. Crack sidewalk south on middle drive, repair. Y inlet at N.W. corner of school property needs new lid (right size) remove board, grout floor. Flume to y inlet is cracked in several places. Standing water N.W. of School between transformers. Y inlet S. of school standing full of water 6" to 8" from top. If you have any questions, please advise. WALKTHRU.HLP.TOWNCTR.RG