Loading...
SC-Town Center E8-CS 940106DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVIS ON DATE: Heartz Road Elementary SHW Group, Inc 1/6/94 SENT 7/14/93 7/14/93 7/14/93 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact (MUD) Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection Utility Final Inspection Water Tap Inspection Water Meter ASSESSED FEE 817,225.00 87,200.00 $891.70 8100.00 $50.00 $200.00 $2,634.37 TotalFees TOTALS $28,301.07 AMOUNT PAID $17,225.00 $7,200.00 8891.70 5100.00 * $50.00 * $200.00 * 82,634.37 Fees Paid $28.301.07 DATE 7/19/93 7/19/93 7/19/93 8/20/93 7/19~93 7/19~93 7il 9~93 Amount Owed $0.00 NOTES * Fees due prior to Building Permint, (Already Issued) 6/30/93 7/19/93 Prior To Construction Erosion Control Approved E,P.A,-N.O.I. Recd. Const, Plan Approved Irrigation Plan Recd. Homeowner's Malnt, Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Controt Maint.