SC-Town Center E8-CS 930714 :l., i ~,~- o .... f Coppell, Texas 75019
The City With A Beautiful Future .... ~ ....... ~ 1214-462-0022
July 14, 1993
Mr. MikeElmore
SHWGroup, Inc.
P.O. Box 619087
Dallas, Texas 75261
RE: Heartz Road Elementary (Coppell Elementary #8)
Development Fees
Dear Mr. Elmore:
We are enclosing a copy of the City of Coppell development fee calculations for Heartz Road
Elementary School.
Typically, a portion of the fees are due at the time of Council approval, a portion at the time
of the Building Permit and a portion prior to the issuance of the meters. However, the permit
has already been issued for this site and no fees have been collected. At this time, a check
should be provided in the amount of $28,201.07. This Covers the amount that was due at the
time of Council approval and at the issuance of the Building Permit plus 2 % inspection fee. The
remaining $396.84 will be due at the issuance of the irrigation meters.
Please provide a check made payable to the City of Coppell in the amount of $28,201.07 and
forward it to Mr. Alan Johnson, Acting Finance Director, Finance Department, along with a
copy of the fee calculations as soon as possible.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees for this project.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E
City Engineer
CC:
Steve Goram, Dir. of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Gary L. Sieb, Director of Planning
Larry Davis, Construction Inspector
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
July 14,1993
Heartz Road Elementary (Coppell Elementary//8)
Water Impact Fee
(100% due prior to Council Approval)
Wastewater Impact (MUD)
(100% due prior to Council Approval)
Utility F'mal Inspection Fee
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
($200.00 due at Issuance of Building Permit)
($100.00 due at Issuance of Irrigation Meter)
Water Meter Fee
(100% due prior to Issuance of Building Permit)
Irrigation
(100% due prior to Issuance of Water Meters)
TOTAL
$17,225.00
$ 7,200.00
*$ 50.00
*$ 300.00
*$ 2,634.37
*$ 296.84
AMOUNT DUE
PRIOR TO COUNCIL
APPROVAL
$ 17,225.00
$ 7,200.00
Total $27,706.21 $24,425.00
2% INSPECTION FEE
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
TOTAL AMOUNT DUE PRIOR TO BUH.DING PERMIT
TOTAL AMOUNT NOW DUE AND PAYABLE
$ 891.70
$24,425.00
$28,201.07
*The remaining $396.84 is due at the time the meters are issued.
file/develop/irrigfee, frm
CITY OF COPPELL
DE~ELOPMENT FEES
Date:
Project:
~uly I,L 1993
Heartz Road Elementary (Coppell Elementary #8)
TOTAL
AMOUNT DUE
PRIOR TO COUNCIL
APPROVAL
Water Impact Fee $17,22~.00 ~' $17,22~.00
(100% due prior to Council Appwval)
Wastewater Impact (MUD)
(100% due prior to Council Approval) ~k\~,\~'\$ 7,200.00 ~
Utility F'mai Inspection Fee x,.... *$ 50.00~
(100% due at Issuance of Building Permit) ~.. ·
\ *$ 300.00-- ~..o~ 0
Water Tap Inspection Fee '~, , ,~.
($200.00 due at Issuance of Building Permit) (~k\~.3
($100.00 due at Issuance of Irrigation Meter)
Water Meter Fee N,,$ 2,634.37" 9~-~
(100% due prior to Issuance of Building Permit)
Irrigation
(100% due prior to Issuance of Water Meters)
*$ 296.84
Total $27,706.21 $24,425.00
2% INSPECTION FEE
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
TOTAL AMOUNT DUE PRIOR TO BIJILDING PERMIT
. TOTAL AMOUNT NOW DUE AND PAYABLE
*The remaining $396.84 is due at the time the meters are issued.
file/developlirrig fee. rrm
$ 891.70
$24,425.00
$ 2.884.37
$28,201.07
HAMILTON, TEXAS 76531 ~17.38~-31al
July 7, 1993
Mr. Mike Elmore
B H W Broup, Inc.
P.O. BoX 61~037
Dallas, Texas 75261
RE: Town Center Elementary Bchool
As requested, the price to provide the £ollowing ii--O"
Two (2) s.s. manholes, 8" sewer line, two (2) stsrm inlets,
389 1.~. ~ 48" RCP pipe, and 160 1.~. ~ 27" RCP pipe. All as
shown in City's easement.
Trusting this is the information y~u need.
Stncere~y,
K.A. Sparks Contractor,
P~esident
cc: E.J. Williams
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
July 14, 1993
Ken Griffin, City $nginger ~
Public Works Staff
Development Fees for Heartz. ~oad Elementary
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 3"
1 - 2"
1 - 8"
Total 26.5
Domestic Meter/s = 16 ESU's
Irrigation Meter/s = 8 ESU's
Fireline Meter/s = 2.5 ESU's
ESU's @ $650.00 ea = $ 17,225.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 3"
Total 16
100% due prior to Council approval
(MUD)
Residential Meters = 16 ESU's
ESU's @ $225.00 ea = $ 7,200.00
of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
100% due prior to issuance of building permit.
Utility Final Inspection Fee
1 lots @ ~ = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water Meter Fee
1 - 3"
1 - 8" X ~"
(LoTS)
Residential Meters @ $1,102.20
DDC Fire Meter @ $1,532.17
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
1 - 2" Irrigation Meters @ $296.84 ea
100% due prior to issuance of water meters.
= $ 1.102.20
= $ 1,532.17
= $296.84
HLP/dm
cc: Steven G. Goram
Director of Public Works
File
FEES.HLP/HEARTZ.HLP