Loading...
SC-Town Center E8-CS 930714 :l., i ~,~- o .... f Coppell, Texas 75019 The City With A Beautiful Future .... ~ ....... ~ 1214-462-0022 July 14, 1993 Mr. MikeElmore SHWGroup, Inc. P.O. Box 619087 Dallas, Texas 75261 RE: Heartz Road Elementary (Coppell Elementary #8) Development Fees Dear Mr. Elmore: We are enclosing a copy of the City of Coppell development fee calculations for Heartz Road Elementary School. Typically, a portion of the fees are due at the time of Council approval, a portion at the time of the Building Permit and a portion prior to the issuance of the meters. However, the permit has already been issued for this site and no fees have been collected. At this time, a check should be provided in the amount of $28,201.07. This Covers the amount that was due at the time of Council approval and at the issuance of the Building Permit plus 2 % inspection fee. The remaining $396.84 will be due at the issuance of the irrigation meters. Please provide a check made payable to the City of Coppell in the amount of $28,201.07 and forward it to Mr. Alan Johnson, Acting Finance Director, Finance Department, along with a copy of the fee calculations as soon as possible. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees for this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E City Engineer CC: Steve Goram, Dir. of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Gary L. Sieb, Director of Planning Larry Davis, Construction Inspector CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 14,1993 Heartz Road Elementary (Coppell Elementary//8) Water Impact Fee (100% due prior to Council Approval) Wastewater Impact (MUD) (100% due prior to Council Approval) Utility F'mal Inspection Fee (100% due at Issuance of Building Permit) Water Tap Inspection Fee ($200.00 due at Issuance of Building Permit) ($100.00 due at Issuance of Irrigation Meter) Water Meter Fee (100% due prior to Issuance of Building Permit) Irrigation (100% due prior to Issuance of Water Meters) TOTAL $17,225.00 $ 7,200.00 *$ 50.00 *$ 300.00 *$ 2,634.37 *$ 296.84 AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 17,225.00 $ 7,200.00 Total $27,706.21 $24,425.00 2% INSPECTION FEE TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL TOTAL AMOUNT DUE PRIOR TO BUH.DING PERMIT TOTAL AMOUNT NOW DUE AND PAYABLE $ 891.70 $24,425.00 $28,201.07 *The remaining $396.84 is due at the time the meters are issued. file/develop/irrigfee, frm CITY OF COPPELL DE~ELOPMENT FEES Date: Project: ~uly I,L 1993 Heartz Road Elementary (Coppell Elementary #8) TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $17,22~.00 ~' $17,22~.00 (100% due prior to Council Appwval) Wastewater Impact (MUD) (100% due prior to Council Approval) ~k\~,\~'\$ 7,200.00 ~ Utility F'mai Inspection Fee x,.... *$ 50.00~ (100% due at Issuance of Building Permit) ~.. · \ *$ 300.00-- ~..o~ 0 Water Tap Inspection Fee '~, , ,~. ($200.00 due at Issuance of Building Permit) (~k\~.3 ($100.00 due at Issuance of Irrigation Meter) Water Meter Fee N,,$ 2,634.37" 9~-~ (100% due prior to Issuance of Building Permit) Irrigation (100% due prior to Issuance of Water Meters) *$ 296.84 Total $27,706.21 $24,425.00 2% INSPECTION FEE TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL TOTAL AMOUNT DUE PRIOR TO BIJILDING PERMIT . TOTAL AMOUNT NOW DUE AND PAYABLE *The remaining $396.84 is due at the time the meters are issued. file/developlirrig fee. rrm $ 891.70 $24,425.00 $ 2.884.37 $28,201.07 HAMILTON, TEXAS 76531 ~17.38~-31al July 7, 1993 Mr. Mike Elmore B H W Broup, Inc. P.O. BoX 61~037 Dallas, Texas 75261 RE: Town Center Elementary Bchool As requested, the price to provide the £ollowing ii--O" Two (2) s.s. manholes, 8" sewer line, two (2) stsrm inlets, 389 1.~. ~ 48" RCP pipe, and 160 1.~. ~ 27" RCP pipe. All as shown in City's easement. Trusting this is the information y~u need. Stncere~y, K.A. Sparks Contractor, P~esident cc: E.J. Williams COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 14, 1993 Ken Griffin, City $nginger ~ Public Works Staff Development Fees for Heartz. ~oad Elementary The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 3" 1 - 2" 1 - 8" Total 26.5 Domestic Meter/s = 16 ESU's Irrigation Meter/s = 8 ESU's Fireline Meter/s = 2.5 ESU's ESU's @ $650.00 ea = $ 17,225.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 3" Total 16 100% due prior to Council approval (MUD) Residential Meters = 16 ESU's ESU's @ $225.00 ea = $ 7,200.00 of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). 100% due prior to issuance of building permit. Utility Final Inspection Fee 1 lots @ ~ = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 3" 1 - 8" X ~" (LoTS) Residential Meters @ $1,102.20 DDC Fire Meter @ $1,532.17 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 1 - 2" Irrigation Meters @ $296.84 ea 100% due prior to issuance of water meters. = $ 1.102.20 = $ 1,532.17 = $296.84 HLP/dm cc: Steven G. Goram Director of Public Works File FEES.HLP/HEARTZ.HLP