SC-Cottonwood E9-CS 960226DEVELOPMENT FEES
PROJECT NAME: Cottonwood Creek Elementary
ENGINEER:
REV S ON DATE: 2/26/96
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
4/7/95 Water Impact Fee
4/7/95
7/14/95
7/17/95
7/31/95
9/18/95
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Irrigation
Street Escrow
Street Cut Permit
Overtime Inspection (7/8)
Overtime Inspection (7/15)
Overtime Inspection (7/29)
Overtime Inspection (9/16)
Water Tap Inspection
Water Meter (Domestic)
Water Meter Deposit
Water Meter (Fire & Irrig.)
Irrigation Meter Deposit
TOTALS
$ ! 5,525.00 $15,525.00 5/18/95
$7,200.00 $7,200.00 5/18/95
$60.00 $60.00 8/30/95
$90.00 $90.00 8/30/95
$60.00 $60.00 8/30/95
$60.00 $60.00 11/9/95
$400.00 $400.00 8/28/95
$885.00 $885.00 8/28/95
$70.00 $70.00 8/28/95
$2,725.00 $2,725.00 8/28/95
$70.00 $70.00 8/28/95
Total Fees Fees Paid Amount Owed
$27,145.00 $27,145.00 $0.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Homeowner's Maint.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.