Loading...
SC-Cottonwood E9-CS 950824DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: Cottonwood Creek Elementary 8/24/95 SENT 4/7/95 4/7/95 7/14/95 7/17/95 7/31/95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection (7/8) Overtime Inspection (7/15) Overtime Inspection (7/29) ASSESSED FEE $15,525.00 $7,200.00 $60.00 $90.00 $60.00 AMOUNT PAID DATE $15,525.00 5/18/95 $7,200.00 5/18~95 TOTALS TotaIFees $22,935.00 Fees Paid Amount Owed $22,725.00 $210.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.