SC-Cottonwood E9-CS 950405COPPELL ENGINEERING
MEMORANDUM
DATE:
TO:
FROM:
RE:
4151 5
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintendent
Development Fees for Cottonwood Creek Elementary
The following fees
referenced project.
Water Impact Fee:
1 - 3"
2 - 2"
1 - 8"
Total 34.5
100% due prior to Council
should be assessed and collected on the above
Domestic Meter/s = 16 ESU's
Irrigation Meter/s = 36 ESU's
Fireline Meter/s =__
2.5 ESU's
ESU's ~ $450.00 ea = $15.525.00
approval of the final plat.
Wastewater Impact
1 - 3" Domestic Meter/s = 16 ESU's
Total 16 ESU's @ $450.00 ea = $7,200.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections @ $100.00 each = $400.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
1 lots @ $50.00/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1__ - ' /~3'?/I Domestic Meters @ 885.00ea = $885.00
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
2 ~/~>~ Irrigation Meter/s @
1 ~ Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
$173.65 ea = $347.30
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $70.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
2 Meters ~ $35.00 ea = $70.00
100% due prior to issuance of water meters.