Loading...
SC-Cottonwood E9-CS 950405COPPELL ENGINEERING MEMORANDUM DATE: TO: FROM: RE: 4151 5 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Cottonwood Creek Elementary The following fees referenced project. Water Impact Fee: 1 - 3" 2 - 2" 1 - 8" Total 34.5 100% due prior to Council should be assessed and collected on the above Domestic Meter/s = 16 ESU's Irrigation Meter/s = 36 ESU's Fireline Meter/s =__ 2.5 ESU's ESU's ~ $450.00 ea = $15.525.00 approval of the final plat. Wastewater Impact 1 - 3" Domestic Meter/s = 16 ESU's Total 16 ESU's @ $450.00 ea = $7,200.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Utility Final Inspection Fee (All Development) 1 lots @ $50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1__ - ' /~3'?/I Domestic Meters @ 885.00ea = $885.00 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 2 ~/~>~ Irrigation Meter/s @ 1 ~ Fireline Meter/s @ $ 100% due prior to issuance of water meter/s. $173.65 ea = $347.30 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 2 Meters ~ $35.00 ea = $70.00 100% due prior to issuance of water meters.