SC-Cottonwood E9-PT 960320Bor~/Excava=ion in Public Righ=-0f-Way Permit
City of Coppe!l - Public works Department
Date: ~/~
Permit Issued To: Name:
Emergent! Phone:
Location of work:
Have ~i City and/or Franchise utilities Been Contac~ and
Existing Utilities Located: YES NO
Will It Be Necessary to Zxcavate Street, Alley or Sidewalk
' Pavement? YES (attach permit) NO
Representative(s) of the Franchise/Contractor must adhere to all
construction standards approved by the City of Ceppell, which
includes but is not limited to: Compaction of Trenches and Bores,
and Barricading according to the Texas Manual on 'Uniform Traffic
Control Devices. Area{s) affected must be restored to as good
condition as before the commencement of work.
kny excavation requiring closing of a street or alley must be
reported to the Police, Fire, and Public Works DeparTments prior
to closing (.%62-1144, 462-1133 and 462-8495).
Attach Work Order (Franchise Only)
PAGE 2
PERMIT
A~=ach Barricading/Detour Plan
applicable.
if a lane or s~ree= closure is
Franchise / Co nc--acnor Representative
Franchise Inspector~or Ciny inspector
A.=prcveClCi=l, Represenna=ive
Auo!icant shall indemnify and forever hold harm. less against each
a~ eve~! claim, demand or cause cf action =h~; may ~e made or come
against ~ by reason of cr if any way arising out of the closure,
blockinq, excavating, cutting, tunneling, or c~her work by the
applicant under permit from the City, if such permit is granted.
Ail contractors will contact Public Works @ 462-8495 to have
trenches and/or open cuts inspected prior to back fill operation
taking place. Staff will be sent to inspect the project. ~.~