Loading...
St Joseph-CS020508 (3)DEVELOPMENT FEES !~ROJECT NAME: --NGINEER: DRIGINATION DATE: StJosephVillage Aguirre, Inc. 5/8/02 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee N/A 6/18/02 Water Impact Fee $14,700.00 6/18/02 Wastewater Impact Fee $14,000.00 Street Sign Street Ught Roadway Impact-Zone N/A Construction Inspection 5/8/02 Eady Grading 2% $12,240.64 6/12/02 2% & 4% Utility insp.fees $28,263.08 Overtime Inspection $12,240.64 rb $28,263.08 rb 5/8/02 6/13/02 6/18/02 Water Tap Inspection $100.00 6/18/02 Wastewater Tap Inspectio $100.00 6/18/02 Water Meter (Domestic) $12,810.00 6/18/02 Water Meter (Fire/Irrig) $0.50 6/18/02 Meter Deposit (Domestic) $60.00 6/18/02 Meter Deposit (Fire/Irrig) $60.00 6/18/02 Utility Final Inspection $100.00 $100.00 di $12,810.00 di $60.00 di 6/20/02 6/20/02 6/20/02 Subtotal toEng. $40,503.72 $40,503.72 $0.00 TOTALS Total Fees Fees Paid Amount Owed $82,433.72 $53,473.72 $28,960.00 Prior To Constmciion Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.