Loading...
TR9101-CS 920117 ~-~ Barton-Aschman Associates, Inc. 5485 Belt Line Road, Suite 199 Dallas, Texas 75240 USA Fax: (214) 490-9261 Metro: 263-9138 January 17, 1992 Ms. M. Shohre Daneshmand, P.E. Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Contractor's Final Payment Denton Tap Road and Bethel Road Dear Ms. Daneshmand: As requested, we have reviewed the Contractor's invoice for final payment for the traffic signal installation at the intersection of Denton Tap Road and Bethel Road. Based on our final inspection conducted October 16, 1991 (documented by memorandum dated October 22, 1991) and field observations made on January 1 7, 1992, final payment is recommended. Barton-Aschman is in the process of completing the "as-built" construction plans and will deliver a reproducible plan set to the City. If additional information or assistance is needed, please let me know. Sincerely, BARTON-ASCHMAN ASSOCIATES, INC. Donald R. Glenn, P.E. Senior Associate DRG:tdb daneshman.ltr