Loading...
St Joseph-WO020716Issued: 1- [~-' 0~. Finished: Phone Numbe-r (~): - 14- gq6-- Check For: Accuracy Test Meter Leak Initial Meter Relocation Inspections 1. Backflow Insp. Backflow Insp. Bkflow Cert. Date Re-Cert. Date WATER Employee: ~ Grid Map: Check Water Pressure Re-Read 2. Repair 3. Maintenance 4. Other A. Main Line A. Pump A. Line Locate B. Valves B. Water Tower B. Line Locate C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electxolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: ~.t~d[~l/~, q-'['~'O~ 7. If Meter / Service Leak, Classify: City A. Water Loss (estimate): GPM __ B. Was Water Metered: C. Was Customer Notified: If Meter Change Out: A. Old Meter # B. New Meter # C. Old Meter Size / Type E. Type of work performed or findings: Fire Plug Flushing YES NO VERBALLY Customer Total Gallons D~R~OC~R Reading Reading New Meter Size / Type / 9. If mainline or deep service repair, describe type of pipe or service line and conditioh: 10. Man hours: 11. List materials used: Crew members: 12. If you had an accident/incident while performing this request, did you report it? 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? YES Signature or NO