Loading...
SC-Wilson E5-CS 920707COPPELL P~BLIC WOPd~ MEMORANDUM DATE FR~: RE-- July 7, 1992 Steven G. Goram, Director of Public Works Rey Gonzales, Streets Superintendent~ Proposed Sidewalk on Coppell Road/Estimate (Tickler 7/10/92) We currently do have the funding to purchase the necessary materials for the asphalt portion of sidewalk from Edinburgh to Halifax. The time to accomplish this project is not easily attainable with the current work demand in the street maintenance function of my shop. It can be done but other outstanding projects would be placed on hold till the sidewalks (concrete and asphalt) could be completed. The two projects would take approximately 30 to 45 days to complete. Next status 7/29/92 RG/dg SIDEWALK. RG