Loading...
SC-Wilson E5-CS 920624June 24, 1992 Re: Coppell Elementary #5/Wilson Elementary Final Acceptance Dear Mr. : A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. The drainage utility has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (June 24, 1993). Sincerely, Larry Davis Construction Inspector CLD/bd cc: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P & Z Coordinator Date Jackson, Building Official COPPFIN