Loading...
SC-Wilson E5-CS 920615COPPELL PUBL'rC WORld8 XEI(ORA.,NDU~ DATE: TO: FROM: RE: June 15, 2992 Steven G. Goram, Director of Public Works Rey Gonzales, Streets Superintenden~ Proposed Sidewalk on Coppell Rd./Estimate As per your request I have put together the following esti attached rendering for the proposed sidewalk between Plantation and Wilson Elementary. Wilson Elementary Sidewalk Estimate $CODe: Plantation North To Wilson Elementary Length - Width - Square Feet - Cubic Yards (Concrete) Fill Material - Cushion Sand - Pro4ected Cost: Concrete 45 Cy @ $46.00 Steel Forms/Stakes Backfill Cushion Sand RG/bc STCRSIDE.RG 600 Ft. 6 Ft. 3,600 Sq. Ft. 45 CY 20 CY 48 CY = $2,070 00 = 425 00 = 600 00 = 160 00 - 385 00 $3,640 00 D i-~ch Prr~£i b