SC-Wilson E5-CS 910517COPPELL PUBLIC WORKS
~EMOHANDUH
DATE:
TO:
FROH:
RE:
May 17, 1991
Shohre Daneshmand, Acting City Engine
Howard Pafford, Water Utilit
Development Fees for
Road
Elementary school
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
I - 3" Domestic Meter/s =
1 2" Irrigation Meter/s =
1 - 6" Fireline Meter/s =
Total 26.5 ESU's
100% due prior to Council approval
16 ESU's
8 ESU's
2.~ ESU's
$660.00 ea = $17,490~00
of final plat.
Wastewater Impact Fee:
1__ - 3__ Domestic Meter/s = 16 ESU's ~ $422.00 = $6,752.00
100% due prior to Council approval of final plat.
'* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
3 Connections ~ $100.00 each = $ 300.00
100% due prior to issuance of building permit.
STREET SIGN ASSESSMENT
for Coppell Elementary School ~5 Coppell Road
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
OTHER
school Zone Flasher
with Timer & Siqns
$2,750.00
3 $ 290~55
2 $5,500.00
TOTAL
* Cost breakdowns may be obtained from Public Works by written
request.
COPPELL.HP
Revised 4/1/91
Sewer Tap Inspection Fee N/A
Connections @ $100.00 each =
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
StreetSigns Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
N/A
Residential Lots at $150.00 each ~ S N/A
Units (Multi family) at $75.00 each = $ N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works