Loading...
Stoneleigh P1-CS 970523The City With A Beautiful Future Mike D°niel, P.E. Nathan D. Maier 8800 N. Central Expwy., Suite 300 Dallas, TX 75231 P.O. Box 478 Coppell, Texas 75019 214-462-0022 May 23, 1997 Stoneleigh at River~ho~e Development Fee Assessment Dear Mr Daniel: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Copper in the amount of $543,360.38 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depa~lment will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on thi~ project. If you have any questions, please contact me. Sincerely, Ke'Tnneth M. Griffin, P.E. Director of Engineering & Public Works CC: Sennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Stoneleigh at Riverchase Date: 5/23/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $34,425.00 $34,425.00 (100% due prior to Council Approval) Water Tap Inspection Fee $250.00 ~ (100% due at Issuance of Water Meter) Water Meter Fee (Fire/Domestic) $14,569.80 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation) $587.94 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireliue Meter Deposit $175.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $22,500.00 $22,500.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $350.00 (100% due at Issuance of Building Permit) Park Fee $462,600.00 $462,600.00 (100% due prior to Council Approval) Roadway Impact Fee $23,835.38 $23,835.38 (100% due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign lee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $559,453.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $543,360.38 DEVELOPMENT FEE WORKSHEET PROJECT: Stoneleigh at Riverchase DATE: 5/23/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 4 inch = 50 ESU's 3 - 2 inch = 24 ESU's -- ESU's 2 - 8 inch = 2.5 ESU's Total #: 76.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 5 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Fire/Domestic): Total #: 2 8"X4" Meter(s) @ $7,284.90 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation): Total #: 3 Irrigation Meter(s) @ Total #: Additional Irrigation Meter(s) @ Total #: Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 Water Meter Deposit Fee (Domestic): Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 5 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 50 @$450.00ea. Wastewater Tap Ingpection Fee: Total #: 2 Domestic Water Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 7 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $34,425.00 $250.00 $14,569.80 $587.94 $60.00 $175.00 $22,500.00 $100.00 $350.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdentlal Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A NIA Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A 360 Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A $462,600.00 $23,835.38 Xnformation not available at tiffs time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at thi~ time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need subrniual of development contracts Page 2 ROADWAY IMPACT FF~E CALCULATIONS PROJECT: DATE: Stond~gh at Rlwrchase $12~1~1 ROADWAY IMPACT FEE: Service Area * Category ** I ~mnd Use ** B,,{ld{-~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee Per Vehicle Mile *** Roadway Impact Fee due -- (Development Units) x 'Vehicle Miles per Develo[mlent Unit) x (Fee per Vehicle Mile) = 7 Residential Multi-Family N/A 36O 2.01 $3OO $217,080.00 * (Figure 2 - Roadway lm.n~t Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) An 89.02% offset per service unit was granted, as per the City$ Roadway Impact Fee ordinance, Crc(fit for proper~y located in the Riverchase development due to the construction of Macarthur Blvd. $193,244.62 and Riverchase Dr.