Stoneleigh P1-CS 970523The City With A Beautiful Future
Mike D°niel, P.E.
Nathan D. Maier
8800 N. Central Expwy., Suite 300
Dallas, TX 75231
P.O. Box 478
Coppell, Texas 75019
214-462-0022
May 23, 1997
Stoneleigh at River~ho~e
Development Fee Assessment
Dear Mr Daniel:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Copper in the amount of $543,360.38 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Depa~lment will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on thi~ project. If you have any questions, please contact me.
Sincerely,
Ke'Tnneth M. Griffin, P.E.
Director of Engineering & Public Works
CC: Sennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Stoneleigh at Riverchase
Date: 5/23/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $34,425.00 $34,425.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $250.00 ~
(100% due at Issuance of Water Meter)
Water Meter Fee (Fire/Domestic) $14,569.80
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation) $587.94
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireliue Meter Deposit $175.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $22,500.00 $22,500.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $350.00
(100% due at Issuance of Building Permit)
Park Fee $462,600.00 $462,600.00
(100% due prior to Council Approval)
Roadway Impact Fee $23,835.38 $23,835.38
(100% due prior to Council Approval)
Street Light Fee N/A
(100% due prior to Acceptance of Project
Street Sign lee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $559,453.12
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $543,360.38
DEVELOPMENT FEE WORKSHEET
PROJECT: Stoneleigh at Riverchase
DATE: 5/23/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
2 - 4 inch = 50 ESU's
3 - 2 inch = 24 ESU's
-- ESU's
2 - 8 inch = 2.5 ESU's
Total #: 76.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 5 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Fire/Domestic):
Total #: 2 8"X4" Meter(s) @ $7,284.90
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation):
Total #: 3 Irrigation Meter(s) @
Total #: Additional Irrigation Meter(s) @
Total #: Fireline Meter(s) @
(100% due prior to issuance of water meters)
$195.98
Water Meter Deposit Fee (Domestic):
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 5 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
50 @$450.00ea.
Wastewater Tap Ingpection Fee:
Total #: 2 Domestic Water Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 7 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$34,425.00
$250.00
$14,569.80
$587.94
$60.00
$175.00
$22,500.00
$100.00
$350.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdentlal Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
NIA
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
360
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
$462,600.00
$23,835.38
Xnformation not
available at tiffs time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at thi~ time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need subrniual of
development contracts
Page 2
ROADWAY IMPACT FF~E CALCULATIONS
PROJECT:
DATE:
Stond~gh at Rlwrchase
$12~1~1
ROADWAY IMPACT FEE:
Service Area *
Category **
I ~mnd Use **
B,,{ld{-~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee Per Vehicle Mile ***
Roadway Impact Fee due -- (Development Units) x
'Vehicle Miles per Develo[mlent Unit) x (Fee per Vehicle Mile) =
7
Residential
Multi-Family
N/A
36O
2.01
$3OO
$217,080.00
* (Figure 2 - Roadway lm.n~t Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
An 89.02% offset per service unit was granted, as per the City$ Roadway Impact Fee ordinance, Crc(fit
for proper~y located in the Riverchase development due to the construction of Macarthur Blvd. $193,244.62
and Riverchase Dr.