Loading...
Stoneleigh P2-CS020206T H E C I T Y 0 F February 6, 2002 Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Two Northpark, Suite 600 8080 Park Lane Dallas, TX 75231 Stoneleigh at Riverchase II Final Acceptance Dear Mike: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received fi.om the contractor. Maturity on the bonds will be two years fi.om the date of this letter. CC: Ken Griff'm, Director of Engineering Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Keller Webster, Project Mgr., Spring Valley Construction