Loading...
Stoneleigh P2-CS 990621The City With A Beautiful Future PO BOX 478 COPPELL, TEXAS 75019 RO Box 478 Coppell, Texas 75019 97'2-462-0022 June 21, 1999 Michael Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Two Northpark / 8080 Park Lane Suite 600 Dallas, Texas 75231 Stoneleigh at Rivarehase II Fee Assessment Letter Park Development Zone: Zone 2 REVISED Dear Mr. Daniel: Enclosed is a revised copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The reason for the revision is that a portion of the water impact fee for the irrigation meters was omitted in the original fee assessment. Please make payment to the City of Coppell in the amount of $661,261.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer cci Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: Stonele~gh et R~verclmse H DATE: 6/21/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 2 - 4 inch = 50 2 - 2 inch = 16 0 = 0 Fimline Meter(s): 2 - 8 inch = 2.5 ESU's ESU's ESU's Total #: 68.5 ESU's @ $450.00 ea. (100% due pdor to Council approval of the final plat) $30,825.00 Water Tap ~specfion tee: Total #: 4 Connections @ $50.00 ea. (Single family due pder to issuance of building permit) (AJI o~er developments due prior to issuance of meter) $200.00 Domestic/~ire Water Meter Fee: Total #: 2 8")(4" Combo Meter(s) @ $7,035.00 (Single family due prior to issuance of'building permit) (All other developments due prior to issuance of meter) $14,070.00 Irrigation Water Meter Fee: Total #: 2 Total #: 0 Irrigation Meter(s) ~ $192.15 Additional Irrigation Meter(s) ~ $0.00 $384.30 ~.00 (100% due prior to issuance of water meters) Domestic?Fire Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) $70.00 Irrigation Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $60.00 Wastewater Impact Fee: Total Domestic Meters ESU's: $450.00 ea. $22,500.00 Wastewater Tap Inspection Fee: Total 0: 2 Connections ~ $50.00 ea. (100% due prior to issuance of building permit) $100.00 Utility Final Inspection Fee (All developments): Total #: 2 Lots ~ $50.00 ea. (100% due prior to issuance of building permit) $100.00 Page I DEVELOPMENTFEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 0 Single-family Q $1,285.00 per lot 322 Multi-tamily ~} $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (Se~ attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Zone 2 $0.00 $413,770.00 $194,166.00 Data Not Available Street Sig= Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Data not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Data not Available Page 2 214 ~ ~9:14 CITY 0~ CO~L ENGINEERING * CITY OM CO~°ELL N0.769 DEVELOP#ENT FEES NEER: Nathan D. Haler Consulting Er~gineers, Inc. ON DATE: S/21./ggrev $3O,87.5.00 $30,825.0O 7/2o10o 3/9/9cj Wastewater Zmpact Fee ($22,500.00) $~,.~X).00 $22,500.00 7/20/00 St:met Sign Street Light , notify S~Teet dept~ 2%14% Const. Zns~. (U~liUes) $~,392.G3 $9,392.$3 2%/4% ~oflst. Iflsp. (pBvJng & gra$13,747.84 $~3,747.84 8122/00 31g/9c] Roadway Impact - Zone 7 (S194,166.00) ~/21/gOrev $104,166.0o /16/OOrev Water Tap InSl~n $200.00 Wastawal:er Tap water t4e~- ~ comb $14,o7o.Qo $14,o7o.oo Water ~ (brig) $384.30 $384.30 Meter Deposit p:X~eVPi~ corn$70.00 $70.00 He~er Dep~ft (zing) $~0.00 SSO.O0 Total Fees TOTALS $S05,139.77 8/23/00 8/23/oo 8/U/O0 8/23/00 8/23/O0 Fees Paid Amoufl~ Owed $505,139.77 $0.00 NOTES Pdor TO CoJ'ub~icflofl Erosion C=flb~01 Approved E.P.A.-N.O.Z. RL,~h Const. p~an A~ Prior To Rnal Acc:eptJnce M Buii~ Plan Reccl. Utilities Bond Recd. lmgaaon Plan Approved Erosion Cont~ Malnt. 10/17/00 ~Prepared by Approved by FUND: CITY OF COPPELL EI"IGIHEERII'IG ~ CITY OF' COF:'PI~LL ND.~9 CiTY OF COPPELL JOURNAL ENTRY POSTED BY:_ J.E. NO ..... --. DATE: ~'-~-o0 DATE: DESCRIPTION ACCOUNT DR. CR. NUMBER TOT~ DATE: C I tY ~ COPPELL EN~ I ~[:R I N~ ~ C I TY {:~ CDPP~LL DEVELOPMENT FI Wa~' llap~l Fee: ~ Me~e~(s): 2 - 4 ~ = 50 F.~ t T~a~ e:. ~a.6 ESU's ~ S4.50.00 (Al o~er cleve~lmw~ due ~wior lm ~nce M m~r) Domestic/Fire Water Meter Fee: (M~~n~ ~~~ bTi~iOl Wat~' Me,er lree: Tom ~. 2 f~ Mw(o) · To~ J: ~ A~lmmal In~Wsn ~s) · -/I)onm~/lqre Wa~r MeUr Delmsit Fee: T~ ~. 2 MM(s) · $3~.o0 ea. · / lrffpM. Me~ DepoW FN: Wimwaar Iml~'t Fu: Tap lu.~erdon fee: Tom S: Uttll~' lrml ImptWoe Fe~ (A~ devdopmen--): TO~ J: 2 Los · t~O.~ ea. $I~0.00 10x17/~ ~:15 C I TY OF CO~LL ENG I NEER I NG -~ C I TY OF COPI~LL ,SOUTHERN MECHANICAL PLUMBING, INC. PAY CITY OF COPPELL iOO11.lEIN MEO.IANIC. AL KUM~ING, INC. RII~i' ~'TATE ~ Of I~(A,,~ Il. 1474 019679 01 9679 SEE ATrACHgD INV. DEVELOPMENT FEE TABLE Project: Stoneleigh at Riverclmse 11 Date: 6/21/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $30,825.00 $30,825.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (DomesticJFireline) $14,070.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation) $384.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic/Fireliae) $70.00 (100% due at Issuance of Water Meter) Irrigation Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $22,500.00 $22,500.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $413,770.00 $413,770.00 (100% due prior to Council Approval) Roadway Impact Fee $194,166.00 $194,166.00 (100% due prior to Council Approval) Street Light Fee Data Not Available (100% due prior to Acceptance of Project Street Sign Fee Data not Available (100% due prior to Acceptance of Project Construction Inspection Fee Data not Available TOTAL $676,245.30 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $661,261.00