Stoneleigh P2-CS 990309Nathan D. Maier Consulting Engineers, Inc.
Two Northpark / 8080 Park Lane Suite 600
Dallas, Texas 75231
PO Box 478
Coppell. Texas 75019
972-46270022
March 9, 1999
Stoneleigh at Riverchase II
Fee Assessment Letter
Park Development Zone: Zone 2
Dear Mr. Daniel:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $657,661.00 and forward
to the Finance Department along with a copy of the Fee Assessment table. This amount is
a portion of the assessed fees that need to be paid prior to Council approval. Please refer
to the attached table for additional fees. Also provide a copy of the Engineer's estimate or
contract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Stoneleigh at Ri~erchase II
Date: 3/9/99
TOTAL AMOUNT DUE
FF~I~S DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $27,225.00 $27,225.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter) '
Water Meter Fee (DomesticfFireline) $14,070.00
(100% due at Issa~ance of Water Meter)
Water Meter Fee (Irrigation) $384.30
(100% due at Iss-ance of Water Meter)
Water Meter Deposit (Domestic/Fireline) $70.00
(100% due at Issuance of Water Meter)
Irrigation Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $22,500.00 $22,500.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $413,770.00 $413,770.00
(100% due prior to Council Approval)
Roadway Impact Fee $194,166.00 $194,166.00
(100% due prior to Council Approval)
Street Light Fee Data Not Available
(100% due prior to Acceptance of Project
Street Sign Fee Data not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Data not Available
TOTAL $672,645.30
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $657,661.00
PROJECT:
DATE:
DEVELOPMENT FEE WORKSHEET
StoneleigA at Riverchase Il
$/9/99
Water Impact Fee:
Domestic Meter(s):
Irrigatlort Meter(s):
Flmllne Meter(s):
2 - 4 inch = 50 ESU'$
2 - 2 inch = 8 ESU's ~4D
0 = 0 ESU's
2 - 8 inch = 2.5 ESU's'
Total #: 60.5 ESU's ~ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections ~ $50.00 ea.
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Domestic/Fire Water Meter Fee: ~
.,j.~ Total #: 2..L/8"~' Combo Meter(s) ~ $7,035.00
~' ~ ~'Single--'~'fan~ly due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation Water Meter Fee:
Total #: 2
Total #: 0
Irrigation Meter(s) ~ $192.15
Additional Irrigation Meter(s) ~ $0.00
(100% due prior to issuance of water meters)
Domestic/Fire Water Meter Deposit Fee:
Total 0: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
Westewater Tap Inspection Fee:
Total 0: 2 Connections ~ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots ~ $50.00 ea.
(100% due prior to issuance of building permit)
$27,225.00
$200.00
$14,070.00
$384.30
$70.00
$100.00
$100.00
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
0 Single-family ¢~ $1,285.00 per lot
322 Multi-family ~} $1,285.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due pdor to final acceptance of development)
Zone 2
$413,770.00
$194,166.(~)0
Data Not Available
Strut Sip Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Data not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Data not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATI~:
,~tone~/gk aa' R/~erv/~as~ H
$/9/99
ROADWAY EMPACT
Serviee Area * 7
Category ** Residential
La~d Use ** Mniti-F~mil~'
Development Units ** 322
Vehicle Miles per Development Unit ** 2.01
Fee per Vehicle Mile *** $300
Roadway I~.~t Fee due = (Developme~ Units) x
Vehicle Miles per Develo~ment Unit) x (Fee per Vehicle Mile) -- $194,166.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Sm~et Escrow or the Roadway Impact Fee.