Loading...
TR9101-CS 910516P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 ' ATTENDANCE SHEET NAME: COMPANY: PHONE: (~) CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: DATE: ASSIGNED INSPECTOR: I. ATTENDANCE: ( See Attached List ) II. PLANS FURNISHED TO: A) CITY YES ~-'""NO__ B ) CONTRACTOR YES NO __ C) OWNER YES __ NO __ III. UTILITY COMPANIES NOTIFIED: A) TELEPHONE B) GAS C ) ELECTRIC ~' D ) CABLE T.V. E) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES HIGP~4AY PERMIT YES RAILROAD PERMIT YES , STREET CUT PERMIT YES BORING PERMIT YES INSPECTION: DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME Ce CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST I~ENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORM S5~ER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. · APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-nO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED B. TRAFFIC DETOUR C. WARNING LIGHTS IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. YEs g-'"' ~ AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMIqI~ING THE CORRECT "AS-BUILT" PLANS TO THE CITY. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)