Loading...
St Ann Catholic-CS011001 (3) MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Garreth Campbell, Construction Inspector Engineering John Borchardt, Streets Division Public Works October 1, 2001 Walk-thru St. Ann's Parish 10/1/01 2. 3. 4. 5. Paint ADA ramps (grooved part only) brick red. Rout and seal all random cracks. Seal curb joints. Repair broken concrete around GTE manhole. Grooved area needs to line up with sidewalk on ADA ramps. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 10×81/01 0g:55 ID--CITY OF COPPELL DATE 18/81 S,R-TIME DISTANT STATION ID 00'25" 992 304 7041 MODE PAGES RESULT CALLING 01 OK 0000 From: Rhonda Brothem To: walk-thru Date: Wed, Sep 26, 2001 4:51 PM Subject: St. Ann's Parish Per Garreth Campbell, please be advised that a walk-through has been scheduled for Monday, October 1 at 8:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.