St Ann Catholic-CS00040404/06/00
16:06
14:4~
CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL
CITY 0~' tOPi:EL ENGINEERIN~ ~ 214 9~ 6288
city WTth ^ ~.u~u,~ '£ ~
NG.078
N0.065
RiD. Box 4?8
C~x~=ell. T~A~S 75019
972~62-~22
April 4, 2000
D04
Chris loues, P.E.
Pach¢co Koch Consulfi-_~ Enginee~
9401 LBS Freeway, Suite 300
Dallas, Texas 7~243
8;, Ann Clthollc Church Addition - Revised Fees
Fee As;essment LeiteF
Dear ~%/r~r. lone. st ~
Enclosed is a copy of ~hc C]W' of Coppcll Roadway Impact F~,,M~'~Agn' sh~-t for the., .,~ ct.
~~e m ~ Cz~ pnor to ~ ~
f~ us~n~nt ~les ~ a b~o~ of i~e f~, pl~de a ~y of ~e
conslzuc~ion coniract to the F. nginee~in8 Dcpaflmcnt to verify ~ applicable inspection
fees,
Providing a copy of your paid receipt m the Engineering Depamne~t will help us to
verLf~ the payment of texluircd fees and insure a successfid beginnir~ of this project. We
look forward to working with you on this plojecc Lf you lmvc aay questions, please
conta~ mc.
$inc~4'~ly,
K.¢nl M. Collins, P.E.
Civil Engineer
J~t'~ Armstrong, Fina~c~ Dir~tor
Doug Stevens, E~n~'ringT~ol~'g0ia~
Glenn Hollowcli. A~t Director of Public Worlds
Greg 3onff. Chief Building Official
Gary Sims, Di~ctor of Lclsu~ Services
04/~6/00 16:07 CITY OF COPPELL ENGINEERING -* CITY OF COPPELL N0,078 Q06
~a~/~d 14:b~ ~11Y U~- CL~LL ENGII~ERINP, - 214 ~2 6~I~0 NC].eSS QOZ
DEVELOPMENT FEE WORKSHEET
PROJECT: ~. Arm CgrtA~c ClmrcA
DATE: 04104/2000
Water Impact Fee:
DameslJe Me,er(s):
IrriGation Meter(s):
Fireline Meter(s):
1 - 2 inch =
0 =
0 ~ 0
2'- 8 inca = 0
Total #: 8 ESU's
( l'~due prior to C~uncil approval ~f lac I'd'tel plat)
Water Tap Inspection Fee:
Total #: 3 Coru~mttofls Q S.q}.00 tee,
'(Siflglo ~m~ due prior to Issuance Of buikftflg permit)
(AJI other devg~opmeflte duo priGr m bsgm of me~r)
Domestic Water Meter Fee:
Total #: 1 Domestic Meier(s) O $192.05
(Single family due priar 1~ i.s~lan=e of builcrm0 permit)
(All otzar developmenis due prior Io Issuanc~ ~f meter)
.rription/Yireline Water Meter Fee:
Yotol #: 0 lfflgBUon Meter(s) Q S0.00
To~ #: ~ ~¢itJonel Imgedofl ldetm($) ~ SO.tM
Tote] ~ T I=Jmline Meter(s) O S3,217.20
(10o% due prior to Issuance o~ W'dter meee~)
Domestic Water Meter Deposit Fee:
Total #: 1 Metm'(a) ~ S3~00 os.
(100% due prior to issuance of water meler~)
Irrigation/Fire Meter Deposit Fee:
Tom #: _.__._2 Meter(s) ~ S30.00
(100% due prior to
We~tewater Impact Fee:
Total DomesUc Me,ers ESU'8: 8
{~ S450.00 ea.
Wastewater Tap Inspection Fee:
Total ~ I Connections ~ SSO.O0 ea,
(100% due prior to issuance ~ buMing peanit)
._Utility Final Inspection Fee (All developmenu):
Total #: 1 LOLS
(100% ~ue pdor to Is~arlce o~ I~Jit~flg pefvltit)
ESU's
ESU's
ESU's
ESU' Nato: Fire Meier A~Ses~e
Wi~ Original Building
$3,500,00
S152.05
$o.oo
$60.00
$3,600.00
S50.00
Page I
04xOG/00 16:06 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 Q05
04/'~5/~ 14:50 CITy OF' CO~I~LL ENGINEERING ~ 214 902 6280 NO.06S
DEVELOPMENT FEE TABLE
Project: St. Ann Catholic C~urcl~ Addition
Date:
TOTAL AMOUNT DUE
Fi~.$ DUE PRIOR'TO
COUNCIL
APPROVAL
Water Impact Fee .... $3 ~60~. O0 $3.600. O0
(100% due prior to Colmdl Al~proval!.
Water Tap Inspection Fee $150.00
(100% due at Is.sual~e of W~er Meter)
Water Meter Fee (Domestic) $!92.05
(100t due at ~uan~e of Water
Water Ivieter Fee (Irriffation/~'treli~) $6,434.4i1
(100% due at Issuance of W ,a,a~ Meter)
Water Meter Deposit ('Donwstic) $'35.00
(100% due at ~ of Water Me,r)
lrrigation/Fireline Meter Deposit 560.00
(100 % due at Issuanc~ of Watei- Meter!
Wast'water Impact Nee $3,600.00 $3,600.00
.... ~ 100% due prior to Codicil Approyal)
Waztewa:er Tap Inspection Fee $50.00
0o0% due at Iss~mc.e,.of~uiidi~ Permi0
Udli~ Final Inspection Fee 550.00
(100% due at Issuance or Building eermi0
Pa~k Fee S0.00 $0.00
(100% due prior to Co,neil Approval)
Roadway Impact i~;e $6,528.60 $6,528.60
(100% due prior to Council Approval)
Str t Light
~ Fee
(100% dug prior to Acceptang~ of Project /d/~ ~ ,,
S~eet Sign Fee ' · . -
(100% due prior to Agr,~tance of Project
Co~truction Inspection Fee f4fu~qm*km not Avi~ilable=
TOTAL $20.700.05
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROYAL
04/06/00 16:07 CITY OF COPPELL ENGINEERING -~ CITY OF COPPELL N0.078 [~07
DEVELOPMENT FEE WORKSHEET
· Park Fee (For Residential Developments Only): * Preliminary pht approved:
Single-family ~ SO,iX) per lot
Mul~-family ~ I0.00 ~er unit
Daid pdm'M Coufleil approval of ~t~ p~t)
paid at issuanoe of buildino permit)
R. oadway Impact Fee:
(See attached fee ~IculatJe~l)
Street Lighting Fees:
A~so~sed ~or ligNJng M the ~ ~-~.
~ ~e ~ ~ ~ ~ ~r T.U. EI~ ~
the I~hting ~afl ~r ~ ~ ~L
Ofl~ the ~a~ am su~. ~.~ ~ I~l ~11 be ~sed.
(1~% due pd~ ~ rm~ ~pmfl~ of d~l~nt)
Street Sip Fees:
A~sessed fo~ signage in the Gity's doht,.Of-way.
(See attac~ed fee caleulalioP.8 If applicable)
Construction Inspection Fees:
A copy of ~e development ceflttact must be submitted f~r as3e,~smeflt.
The contr~ts sh~ld indicate the cost to cm~ma~t ~e improvementa
· at ar~ inspected ~ the Englnee~ng Deport~eflL
(2% of deYelopmeAt c~st required ~or private improvements)
(4°,~ of deveropment ~)s! ~equired for pubJl~ improvements)
i -7,~-13 ",
Page 2
lafoA'natlofl,-flot Availabl .e.,~
0~0G~00
1G:07
DATE:
CITY DF COPPELL ENGINEERING * CITY OF CDPPELL
ROADWAY IMPACT FF, E CALCULATIONS
~0.078
' 0r~ue 2 - Ro~dvay Zmpm
"CTablt $ - Roadway huput F-~
"' (~chednlt 2. Page 3 - Roadway [mp~. F~ Study)
ST AJ~H'$ CATHOLIC CHURCH P~ojec~ Area (GSF): 02/2g/~ ~
~ __ ,,,,,,,,,,,t,,,,,,,,,, ~~~ ~.~ ~ ~,,,,,,,,,,----
TILT-UP WALl P~ELS ~ ~&l ~ ~ ~e ~ ~ ~a~ f~ ~ ~