St Ann Catholic-CS 991217CITY OF COPPELL ENGINEERING - CiTY OF COPPELL
817417550B ~ ~XC. AVATION
N0.078
P~GE 83
AREA
F. xcevetion & Utility Contreotore
P.O. Box 423
Mafl$fiel~. Toxa~ 16063
METRo: (817) 417-9700
FAX: {817) 417-9600
December ]7, 1999
Centex Construction Co
10150 Nonroe Dr.
Dallas, Texas 75229
Attar Jeff Parsons:
Re: gt, Ann Catholic Church
Coppell, Texas
Subj, Utility Work
Gentlemen,
Area Excavation & Utility Contractors propose to £urnish
the necessary labor, materials and equipment to install the
following quantities of work. Plans by Pacheco Koch Consulting
Engineers. Plans dated Nov. ~999. Ref pages C2.02 and C3.01.
Alternate bid ref pages C2.02A and C3.01A.
Base bid
Storm Drainage
Install 24" storm drainage 270LF
Install 217 storm drainage 30L~
Remove exist inlets 4 each
Install 14' curb inlet 1 each
Install 10' curb inlets 2 each
Inntall 12, curb inlets 1 each
Total Amount:
Water Hain
Install 8" water line II77LF
InStall 6" water line 361LP
InBtall 2" water line 300LF
.Install necessary cast iron fittings
8# gate valves I each
8X8 tap sleeve & valves 3 each
6u ga~e valves
Fire Hydrants 3 each
$24,540.00
Lump Sum
3 each
Install new de~ector check & vault I each
Relocate existing detector check & vault I each
Relocate 2- services(meters) 2 each
Pavement repair
250LF
Total Amount= $60,395.00
o .