Loading...
St Ann Catholic-CS000922 214 304 35?0 09/22/00 15:47 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.696 ~01 DEVELOPMENT FEE TABLE Project: St. Ann Catholic Church Addition (Additional 2" Irrigation Meter) Date: 912~1oo TOTAL FEES DUE water Impact Fee $3.600.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Mctcr Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $192.03 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireliac Meter Deposit $30.00 , (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council A. pproval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee ..... (100% due prior to Council Approval) Roadway Impact Fee .... $0.00 (100 % due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptanc, e of Project Construction Inspection Fee N/A TOTAL $3,872.05 09×22×00 15:49 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.696 ~02 DEVELOPMENT FEE WORKSHEET PROJECT: St. Ann C~holic Church Addition (Addi~onnl 2" Irrfgelfon Meter) DA TE: 9/22100 Water Impact Fee: Damestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 2 inch = 8 ESU's 0 =" 0 ESU's 0 = 0 ESU's Total #: 8 ESU's @ S450.00 ea. "(100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: ._...~_1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 '(Single family due prior to issuance of building permit) (All other developments clue prior to issuance of meter) Irri;gation/Fireline Water Meter Fee: Total #: I Irrigation Meter(s) @ Total #: ' 0 Additional Irrigation Meter(s) @ Total 0: - 0 Fireline Meter(s) @ -(100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $3500 es. '~100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: ~1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 $192.05 $o.oo $o.oo @$450.00 ea. Wastewater Tap Inspection Fee: Total O: ~0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #; 0 Lots @ $50.00 ea. (100% due prior to issuance of building p~rmit) $3,600.00 $50.00 $0.00 $192.05 $0.00 $0.00 $30.00 $13.00 $0.00 $0.00 Page 1