St Ann Catholic-CS000922 214 304 35?0
09/22/00 15:47 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.696 ~01
DEVELOPMENT FEE TABLE
Project: St. Ann Catholic Church Addition (Additional 2" Irrigation Meter)
Date: 912~1oo
TOTAL
FEES DUE
water Impact Fee $3.600.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Mctcr Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $192.03
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireliac Meter Deposit $30.00
, (100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council A. pproval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee .....
(100% due prior to Council Approval)
Roadway Impact Fee .... $0.00
(100 % due prior to Council Approval)
Street Light Fee N/A
(100% due prior to Acceptance of Project
Street Sign Fee N/A
(100% due prior to Acceptanc, e of Project
Construction Inspection Fee N/A
TOTAL $3,872.05
09×22×00 15:49 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.696 ~02
DEVELOPMENT FEE WORKSHEET
PROJECT: St. Ann C~holic Church Addition (Addi~onnl 2" Irrfgelfon Meter)
DA TE: 9/22100
Water Impact Fee:
Damestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0 = 0 ESU's
1 - 2 inch = 8 ESU's
0 =" 0 ESU's
0 = 0 ESU's
Total #: 8 ESU's @ S450.00 ea.
"(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: ._...~_1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
'(Single family due prior to issuance of building permit)
(All other developments clue prior to issuance of meter)
Irri;gation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @
Total #: ' 0 Additional Irrigation Meter(s) @
Total 0: - 0 Fireline Meter(s) @
-(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $3500 es.
'~100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: ~1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0
$192.05
$o.oo
$o.oo
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total O: ~0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #; 0 Lots @ $50.00 ea.
(100% due prior to issuance of building p~rmit)
$3,600.00
$50.00
$0.00
$192.05
$0.00
$0.00
$30.00
$13.00
$0.00
$0.00
Page 1