Loading...
Town Center L2B3-CS040701 (2)DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINAT ON DATE: Village @ Town Center (Lot 2 Block 3) Dowdey Anderson 7/1/2OO4 SENT 7/1/2004 7/6/2OO4 ASSESSMENT ASSESSED FEE Water Impact Fee $3,640.00 Wastewater Impact Fee $2,240.00 Park Fee n/a Roadway Impact-Zone n/a Street Sign Street Light Construction Inspection $2,434.00 EG or Bore Permit Overtime Inspection Water Tap Inspection $150.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $188.48 Water Meter (Fire/Irrig) $2,046.30 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $60.00 Utility Final Inspection $50.00 AMOUNT PAlE DATE $3,640.00 bh 7/8/2007 $2,240.00 bh 7/8/2004 $2,434.00 pc 7/6/2004 $150.00 di 7/30~2004 $50.00 di 7/30/2004 $188.48 di 7/30/2004 $2,046.30 di 7/30/2004 $30.00 di 7/30/2004 $60.00 di 7/30/2004 $50.00 di 7/30/2004 ~Subtotal to En~. $2,434.00 $2,434.00 $0.00 Total Fees Fees Paid Amount Owed TOTALS $10,888.78 $10,888.78 $0.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.