Town Center L2B3-CS040701 (2)DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIGINAT ON DATE:
Village @ Town Center (Lot 2 Block 3)
Dowdey Anderson
7/1/2OO4
SENT
7/1/2004
7/6/2OO4
ASSESSMENT ASSESSED FEE
Water Impact Fee $3,640.00
Wastewater Impact Fee $2,240.00
Park Fee n/a
Roadway Impact-Zone n/a
Street Sign
Street Light
Construction Inspection $2,434.00
EG or Bore Permit
Overtime Inspection
Water Tap Inspection $150.00
Wastewater Tap Inspection $50.00
Water Meter (Domestic) $188.48
Water Meter (Fire/Irrig) $2,046.30
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $60.00
Utility Final Inspection $50.00
AMOUNT PAlE DATE
$3,640.00 bh 7/8/2007
$2,240.00 bh 7/8/2004
$2,434.00 pc 7/6/2004
$150.00 di 7/30~2004
$50.00 di 7/30/2004
$188.48 di 7/30/2004
$2,046.30 di 7/30/2004
$30.00 di 7/30/2004
$60.00 di 7/30/2004
$50.00 di 7/30/2004
~Subtotal to En~. $2,434.00 $2,434.00 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $10,888.78 $10,888.78 $0.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.