Loading...
Riverchase (6.2)-CS 941028October 28, 1994 Winkelmann & Associates 12800 Hillcrest Road Suite 200 Dallas, Texas 75230 RE: Kids- R-Kids Development Fee Assessment Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Kids-R-kids addition. Please make payment to the City of Coppell in the amount of $10.425.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection tee can be verified. Providing a copy of your paid receipt to our office will help us to verity payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. Public Works/City Engineer Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager DATE FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM October 28, 1994 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Kids-R-Kids The following fees referenced project. Water Impact Fee: 1 - 2" 1 -1- Total 10.5 should be assessed and collected on the above Domestic Meter/s = 8 ESU's Irrigation Meter/s = 2.5 ESU's ESU's @ $650.00 ea = ~5.00 100% Wastewater Impact 1 - 2" Total 8 due prior to Council approval of the final plat. Domestic Meter/s = 8 ESU's ESU's @ $450.00 ea = $ 3,600.00 100% due prior to Council approval Water Tap Inspection Fee 2 Connections @ $100.00 each = of the final plat. 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance Of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ ~ = $50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 2" (Domestic) Domestic Meters @ 189.10 ea = $ 189.10 100% due prior to issuance of building permit for'residential only. Ail other development fees are due prior to issuance.of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 Irrigation Meter/s ~ $ 46.10 ea 100% due prior to issuance of water meter/s. = $ 46.10 Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. CITY OF COPPELL DEVELOPMENT FEES Date: Project: October 28, 1994 Kids-R-Kids TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPRQVAL Water Impact Fee 6,825.00 6,825.00 (100% due prior to Council Approval) Water Tap Inspection Fee 200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 189.10 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Residential) -0- -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 46.10 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee '* information not -0- (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Bnilding Permit) Street Escrow (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $10,945.20 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 10,425.00 * This t~:e cam~ot be asses~d until after TU Electric submits the lighting plan fbr the proposed project. Once the plan is submitted. $292.60 per light will be assessed. DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVIS ON DATE: Kids-R-Kids Winklemann & Associates 1 / 10/95 SENT 10/28/94 10/28/94 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection ASSESSED FEE $6,825.00 $3,600.00 $6,825.00 $3,600.00 DATE TOTALS TotalFees $10,425.00 42~,/ ~ $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd, Homeowner's Uaint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.